共 27 条
[1]
Ahmadi R.H., Kouvelis P., Staging problem of a dual delivery pick-and-place machine in printed circuit card assembly, Oper Res, 42, pp. 81-91, (1994)
[2]
Askin R.G., Dror M., Vakharia A.J., Printed circuit board family grouping and component allocation for a multimachine, open-shop assembly cell, Nav Res Log, 41, pp. 587-608, (1994)
[3]
Ball M.O., Magazine M.J., Sequencing of insertions in printed circuit board assembly, Oper Res, 36, pp. 192-201, (1988)
[4]
Bard J.F., Clayton R.W., Feo T.A., Machine setup and component placement in printed circuit board assembly, Int J Flex Manuf Syst, 6, pp. 5-31, (1994)
[5]
Crama Y., Kolen A.W.J., Oerlemans A.G., Spieksma F.C.R., Throughput rate optimization in the automated assembly of printed circuit boards, Ann Opers Res, 26, pp. 455-480, (1990)
[6]
Crama Y., Kolen A.W.J., Oerlemans A.G., Spieksma F.C.R., Minimizing the number of tool switches on a flexible machine, Int J Flex Manuf Syst, 6, pp. 33-54, (1994)
[7]
Deane R.H., Moon S.H., Work flow control in the flexible flow line, Int J Flex Manuf Syst, 3, 4, pp. 217-235, (1992)
[8]
Grunow M., Gunther H.O., Gronalt M., Zeller R., A heuristic for component switching on SMD placement machines, Discussion Paper, (1996)
[9]
Gunther H.O., Gronalt M., Piller F., Computergestützte Simulation eines hochautomatisierten Montagesystems, Management & Computer, 2, pp. 25-32, (1994)
[10]
Gunther H.O., Gronalt M., Piller F., A linear programming model for workload planning in printed circuit board assembly, Operations Research Proceedings 1994, pp. 312-317, (1995)