共 29 条
[1]
Zhang S(2004)A review of internet-based product information sharing and visualization Comput Ind 54 1-15
[2]
Shen W(1991)A correct and complete algorithm for the generation of mechanical assembly sequences IEEE Trans Robot Automat 7 228-240
[3]
Ghenniwa H(1998)Geometric reasoning about assembly tools Artificial Intelligence 98 237-279
[4]
Homen De Mello LS(2000)A genetic algorithm for generating optimal assembly plans Artif Intell Eng 14 319-329
[5]
Sanderson AC(2000)Disassembly sequence and cost analysis for electromechanical products Robot Comput Integr Manuf 16 43-54
[6]
Wilson HR(1999)A novel means of generating assembly sequences using the connector concept J Intell Manuf 10 423-435
[7]
Lazzerini B(2003)A connector-based hierarchical approach to assembly sequence planning for mechanical assemblies Comput Aided Des 35 37-56
[8]
Marcelloni F(2004)Connector-based approach to assembly planning using a genetic algorithm Int J Prod Res 42 2243-2261
[9]
Kuo TC(1998)Probe orientation for coordinate measuring machine systems using design models Robot Comput Integr Manuf 14 229-236
[10]
Tseng HE(1994)CMM feature accessibility and path generation Robot Comput Integr Manuf 32 597-618