Analysis of Scheduling Schemes and Heuristic Rules Performance in Resource-Constrained Multiproject Scheduling

被引:19
作者
Antonio Lova
Pilar Tormos
机构
[1] Universidad Politécnica de Valencia,Department of Statistics and Operations Research
来源
Annals of Operations Research | 2001年 / 102卷
关键词
project management; multiproject scheduling; heuristic based on priority rules; resource allocation; project management software;
D O I
暂无
中图分类号
学科分类号
摘要
Frequently, the availability of resources assigned to a project is limited and not sufficient to execute all the concurrent activities. In this situation, decision making about their schedule is necessary. Many times this schedule supposes an increase in the project completion time. Additionally, companies commonly manage various projects simultaneously, sharing a pool of renewable resources. Given these resource constraints, we often can only apply heuristic methods to solve the scheduling problem. In this work the effect of the schedule generation schemes – serial or parallel – and priority rules – MINLFT, MINSLK, MAXTWK, SASP or FCFS – with two approaches – multi-project and single-project – are analysed. The time criteria considered are the mean project delay and the multiproject duration increase. Through an extensive computational study, results show that with the parallel scheduling generation scheme and the multi-project approach the project manager can obtain a good multiproject schedule with the time criterion selected: minimising mean project delay or minimising multiproject duration increase. New heuristics – based on priority rules with a two-phase approach – that outperform classical ones are proposed to minimise mean project delay with a multi-project approach. Finally, the best heuristics analysed are evaluated together with a representative sample of commercial project management software.
引用
收藏
页码:263 / 286
页数:23
相关论文
共 42 条
[1]  
Bock D.B.(1990)A comparison of due date setting, resource assignment, and job preemption heuristics for the multiproject scheduling problem Decision Sciences 21 387-402
[2]  
Patterson J.H.(1990)Some efficient multi-heuristic procedures for resource constrained project scheduling European Journal of Operational Research 49 3-13
[3]  
Boctor F.F.(1987)Project scheduling with resource constraints: A branch and bound approach European Journal of Operational Research 29 262-273
[4]  
Christofides N.(1976)Heuristics for scheduling resource constrained scheduling projects: an experimental investigation Management Science 22 1186-1194
[5]  
Alvarez-Valdés R.(1975)A comparison of heuristics and optimum solutions in resource constrained project scheduling Management Science 21 944-955
[6]  
Tamarit J.M.(1988)Evaluating project scheduling and due date assignment procedures: An experimental analysis Management Science 34 101-118
[7]  
Cooper D.F.(1995)An approach to the modelling and analysis of software production processes International Transactions in Operational Research 2 117-135
[8]  
Davis E.W.(1992)Resource constrained scheduling capabilities of commercial project management software Project Management Journal 22 39-43
[9]  
Patterson J.H.(1952)The use of studentized range in connection with analysis of variance Euphytica 1 112-122
[10]  
Dumond J.(1996)Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation European Journal of Operational Research 90 320-333