Bock D.B.(1990)A comparison of due date setting, resource assignment, and job preemption heuristics for the multiproject scheduling problem Decision Sciences 21 387-402
[2]
Patterson J.H.(1990)Some efficient multi-heuristic procedures for resource constrained project scheduling European Journal of Operational Research 49 3-13
[3]
Boctor F.F.(1987)Project scheduling with resource constraints: A branch and bound approach European Journal of Operational Research 29 262-273
[4]
Christofides N.(1976)Heuristics for scheduling resource constrained scheduling projects: an experimental investigation Management Science 22 1186-1194
[5]
Alvarez-Valdés R.(1975)A comparison of heuristics and optimum solutions in resource constrained project scheduling Management Science 21 944-955
[6]
Tamarit J.M.(1988)Evaluating project scheduling and due date assignment procedures: An experimental analysis Management Science 34 101-118
[7]
Cooper D.F.(1995)An approach to the modelling and analysis of software production processes International Transactions in Operational Research 2 117-135
[8]
Davis E.W.(1992)Resource constrained scheduling capabilities of commercial project management software Project Management Journal 22 39-43
[9]
Patterson J.H.(1952)The use of studentized range in connection with analysis of variance Euphytica 1 112-122
[10]
Dumond J.(1996)Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation European Journal of Operational Research 90 320-333