A COMPARISON OF EXACT APPROACHES FOR SOLVING THE MULTIPLE CONSTRAINED RESOURCE, PROJECT SCHEDULING PROBLEM

被引:229
作者
PATTERSON, JH [1 ]
机构
[1] UNIV MISSOURI,COLUMBIA,MO 65201
关键词
D O I
10.1287/mnsc.30.7.854
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
25
引用
收藏
页码:854 / 867
页数:14
相关论文
共 25 条
[1]   AN ADDITIVE ALGORITHM FOR SOLVING LINEAR PROGRAMS WITH 0-1 VARIABLES [J].
BALAS, E .
OPERATIONS RESEARCH, 1965, 13 (04) :517-&
[2]  
BALAS E, 1970, PROJECT SCHEDULING R
[3]  
BRAND JD, 1964, 5 U ILL DEP CIV ENG
[4]  
Davis E. W., 1973, AIIE T, V5, P297
[5]  
DAVIS EW, 1966, J IND ENGINEERING, V17, P177
[6]  
DAVIS EW, 1971, MANAGE SCI B-APPL, V17, pB803
[7]   COMPARISON OF HEURISTIC AND OPTIMUM SOLUTIONS IN RESOURCE-CONSTRAINED PROJECT SCHEDULING [J].
DAVIS, EW ;
PATTERSON, JH .
MANAGEMENT SCIENCE SERIES B-APPLICATION, 1975, 21 (08) :944-955
[8]  
DAVIS EW, 1969, THESIS YALE U
[9]   OPTIMAL SOLUTION OF SCHEDULING PROBLEMS USING LAGRANGE MULTIPLIERS .1. [J].
FISHER, ML .
OPERATIONS RESEARCH, 1973, 21 (05) :1114-1127
[10]  
GORENSTEIN S, 1972, OPER RES, V20, P835, DOI 10.1287/opre.20.4.835