共 32 条
[1]
Baker K.R., Sequencing rules and due-date assignments in a job shop, Management Science, 30, 9, pp. 1093-1104, (1984)
[2]
Blackstone J.H., Phillips D.T., Hogg G.L., A state-of-the-art survey of dispatching rules for manufacturing job shop operations, International Journal of Production Research, 20, 1, pp. 27-45, (1982)
[3]
Carnal C.A., Wild R., The location of variable work stations and the performanceof production flow lines, International Journal of Production Research, 14, 6, pp. 703-710, (1976)
[4]
Darel E.M., Wysk R.A., Job shop scheduling-A systematic approach, Journal of Manufacturing Systems, 1, 1, pp. 77-78, (1982)
[5]
Davis L.E., Pacing effects on manned assemblylines, International Journal of Production Research, 4, 3, pp. 171-184, (1966)
[6]
Dixon J.R., Nanni A.J., Vollman T.E., The New Performance Challenge, (1990)
[7]
El-Rayah T.E., The effect of inequality ofinterstage buffercapacitiesand operation time variabilityon the efficiency of production linesystems, International Journal Ofproduction Research, 17, 1, pp. 77-89, (1979)
[8]
El-Rayeh T.E., The efficiency of balanced and unbalanced production lines, International Journal of Production Research, 17, 1, pp. 61-75, (1979)
[9]
Fry T.D., Cox J.F., Manufacturing performance: Local versus global measures, Production and Inventory Management Journal, 30, 2, pp. 52-56, (1989)
[10]
Fry T.D., Philipoom P.R., Markland R.E., An investigation of due date assignment rules in a multi-stage production environment, IIE Transactions, 21, 2, pp. 153-161, (1988)