共 10 条
[1]
ASCHMONEIT FC, IEEE T POWER APP SYS, V98, P770
[2]
OPTIMIZATION OF REAL-TIME DISPATCH WITH CONSTRAINTS FOR SECURE OPERATION OF BULK POWER-SYSTEMS
[J].
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS,
1977, 96 (03)
:741-757
[3]
STUDIES ON POWER SYSTEM LOAD FLOW EQUIVALENCING
[J].
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS,
1980, 99 (06)
:2301-2310
[4]
NUMERICAL TESTING OF POWER SYSTEM LOAD FLOW EQUIVALENTS
[J].
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS,
1980, 99 (06)
:2292-2300
[5]
HUBBI W, 1983, ELECTRICAL POWER ENE, V5, P166
[6]
HUBBI W, THESIS QUEENS U BELF
[7]
FAST DECOUPLED LOAD FLOW
[J].
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS,
1974, PA93 (03)
:859-869
[8]
STOTT B, 1984, COMMUNICATION JUN
[9]
Tripathy SC, 1982, IEEE T POWER APP SYS, VPAS-101
[10]
WU FF, 1977, IEEE T POWER APP SYS, V96, P273