共 73 条
- [1] Abernathy W.J., Wayne K., Limits of the learning curve, Harvard Business Review, 52, pp. 109-119, (1974)
- [2] Alchian A., Reliability of progress curves in airframe production, Economertrica, 31, 4, pp. 679-693, (1963)
- [3] Asher H., Cost-Quantity Relationships in the Airframe Industry, (1956)
- [4] Badiru A.B., Project Management in Manufacturing and High Technology Operations, (1988)
- [5] Badiru A.B., Systems integration for total quality management, Engineering Management Journal, 2, 3, pp. 23-28, (1990)
- [6] Badiru A.B., Manufacturing cost estimation: A multivariate learning curve approach, Journal of Manufacturing Systems, 10, 6, pp. 431-441, (1991)
- [7] Badiru A.B., Computational survey of univariate and bivariate learning curves, IEEE Transactions on Engineering Management, 39, 2, pp. 176-188, (1992)
- [8] Bailey C.D., Forgetting and the learning curve: A laboratory study, Management Science, 35, 3, pp. 340-352, (1989)
- [9] Baloff N., Extension ofthe learning curve-some empirical results, Operations Research Quartely, 22, 4, pp. 329-340, (1971)
- [10] Belkaoui A., Costing through learning, Cost and Management, 50, 3, pp. 36-40, (1976)