THE NP-COMPLETENESS COLUMN - AN ONGOING GUIDE

被引:16
作者
JOHNSON, DS
机构
关键词
D O I
10.1016/0196-6774(83)90045-7
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
引用
收藏
页码:189 / 203
页数:15
相关论文
共 61 条
[1]  
Adleman L., 1978, 19th Annual Symposium on Foundations of Computer Science, P75, DOI 10.1109/SFCS.1978.37
[2]  
Aho A. V., 1974, DESIGN ANAL COMPUTER, V1st
[3]  
ATALLAH MJ, 1982, 14TH P ACM S THEOR C, P345
[4]  
Bentley J. L., 1980, J ALGORITHMS, V1, P51
[5]  
BLAZEWICS J, 1980, POLYNOMIAL TIME ALGO
[6]   SCHEDULING SUBJECT TO RESOURCE CONSTRAINTS - CLASSIFICATION AND COMPLEXITY [J].
BLAZEWICZ, J ;
LENSTRA, JK ;
KAN, AHGR .
DISCRETE APPLIED MATHEMATICS, 1983, 5 (01) :11-24
[7]   DEADLINE SCHEDULING OF TASKS WITH READY TIMES AND RESOURCE CONSTRAINTS [J].
BLAZEWICZ, J .
INFORMATION PROCESSING LETTERS, 1979, 8 (02) :60-63
[8]  
Book R. V., 1976, Theoretical Computer Science, V1, P215, DOI 10.1016/0304-3975(76)90057-8
[9]   RELATING TIME AND SPACE TO SIZE AND DEPTH [J].
BORODIN, A .
SIAM JOURNAL ON COMPUTING, 1977, 6 (04) :733-744
[10]  
BORODIN A, 1982, 14TH P ACM S THEOR C, P338