ONE-STAGE AND 2-STAGE SCHEDULING OF 2 PRODUCTS WITH DISTRIBUTED INSERTED IDLE TIME - THE BENEFITS OF A CONTROLLABLE PRODUCTION-RATE

被引:26
作者
BUZACOTT, JA
OZKARAHAN, IA
机构
关键词
1983_021917_744_3.xlsx;
D O I
10.1002/nav.3800300413
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
SCHEDULING
引用
收藏
页码:675 / 696
页数:22
相关论文
共 8 条
[1]  
BUZACOTT JA, 1981, 1981 ORSA TIMS HOUST
[2]   ECONOMIC LOT SIZE DETERMINATION IN MULTI-STAGE ASSEMBLY SYSTEMS [J].
CROWSTON, WB ;
WAGNER, M ;
WILLIAMS, JF .
MANAGEMENT SCIENCE SERIES A-THEORY, 1973, 19 (05) :517-527
[3]  
DUDLEY NA, 1968, WORK MEASUREMENT SOM
[4]   ECONOMIC LOT SCHEDULING PROBLEM (ELSP) - REVIEW AND EXTENSIONS [J].
ELMAGHRABY, SE .
MANAGEMENT SCIENCE, 1978, 24 (06) :587-598
[5]  
Goyal, 1975, INT J PROD RES, V13, P615
[6]   A REVIEW OF PRODUCTION SCHEDULING [J].
GRAVES, SC .
OPERATIONS RESEARCH, 1981, 29 (04) :646-675
[7]   THE DETERMINISTIC, 2-PRODUCT, INVENTORY SYSTEM WITH CAPACITY CONSTRAINT [J].
HARTLEY, R ;
THOMAS, LC .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1982, 33 (11) :1013-1020
[8]   DETERMINISTIC MULTI-ITEM INVENTORY SYSTEMS WITH LIMITED CAPACITY [J].
ZOLLER, K .
MANAGEMENT SCIENCE, 1977, 24 (04) :451-455