HEURISTICS FOR OPERATOR SCHEDULING IN GROUP TECHNOLOGY CELLS

被引:7
作者
CHEN, HG [1 ]
机构
[1] UNIV NOTRE DAME, NOTRE DAME, IN USA
关键词
D O I
10.1016/0305-0548(94)00029-8
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
We devised heuristic approaches for operator scheduling in manned Grouped Technology (GT) cells. The heuristic approach consists of (1) Cycle Switching Rules (CSR) to deal with production environments covering a longer decision horizon, and (2) Dynamic Scheduling Rules (DSR) to deal with environments covering a shorter decision horizon. They differ in information requirements and decision horizons. In simulation experiments, we show that there is a predictable trade-off between the quality of the resulting schedule and the information content of heuristics used.
引用
收藏
页码:261 / 276
页数:16
相关论文
共 30 条
[1]  
BAKER CT, 1960, MANAGE SCI, V6, P211
[2]  
BLACK JT, 1983, IND ENG, V15, P36
[3]  
Burbridge John L., 1975, INTRO GROUP TECHNOLO
[4]   FLEXIBLE MANUFACTURING SYSTEMS - A REVIEW OF ANALYTICAL MODELS [J].
BUZACOTT, JA ;
YAO, DD .
MANAGEMENT SCIENCE, 1986, 32 (07) :890-905
[5]   A MIXED INTEGER PROGRAMMING-MODEL FOR OPERATOR CYCLIC WALKING PATTERN DEVELOPMENT IN GT CELLS [J].
CHEN, HG .
COMPUTERS & INDUSTRIAL ENGINEERING, 1991, 20 (01) :77-88
[6]  
CHEN HG, 1982, INT J PRO RES, V30, P2155
[7]   SIMULATION OF A GROUP TECHNOLOGY PRODUCT CELL [J].
DALE, BG ;
DEWHURST, F .
ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1984, 8 (1-2) :45-54
[8]   CHARACTERIZATION OF AUTOMATIC GUIDED VEHICLE DISPATCHING RULES [J].
EGBELU, PJ ;
TANCHOCO, JMA .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1984, 22 (03) :359-374
[9]   JOB-SHOP VS HYBRID FLOWSHOP ROUTING IN A DUAL RESOURCE CONSTRAINED SYSTEM [J].
ELVERS, DA ;
TRELEVEN, MD .
DECISION SCIENCES, 1985, 16 (02) :213-222
[10]   EFFECTS OF SHOP SIZE AND LABOR FLEXIBILITY IN LABOR AND MACHINE LIMITED PRODUCTION SYSTEMS [J].
FRYER, JS .
MANAGEMENT SCIENCE SERIES A-THEORY, 1975, 21 (05) :507-515