Energy saving actions;
Cement industry;
ISIRI;
7873;
standard;
CUSUM technique;
D O I:
10.1016/j.seta.2015.03.003
中图分类号:
X [环境科学、安全科学];
学科分类号:
08 [工学];
0830 [环境科学与工程];
摘要:
Energy consumption assessment in a cement production plant is studied in this paper and a guideline for reducing energy consumption is provided according to a national standard-ISIRI 7873. Based on energy assessment, several energy saving actions were implemented and valuated. The proposed energy saving actions varied between simple actions to complicated and high-cost investments. By introducing energy saving actions, the electrical and thermal energy required for each additional unit of production decreased by 10.4% and 7.6% from 2008 to 2010, respectively. Hence, considering improvements introduced to the process control, this led to 22.6% and 19.9% improvements in the electrical and thermal specific energy consumptions, respectively. The Cumulative SUM of differences technique (CUSUM) was applied to assess saving actions in the period of implementation. The benefit of the CUSUM is that it gives a method to measure whether steady saving conditions are achieved or not. The continual improvement achieved since the slopes of trend lines in the CUSUM charts decreased for both electrical and thermal energy in 2010 in comparison with 2009. Also, the total cost savings in 2009 and 2010 were about 3.4 million USD which covered all of the 2.5 million USD costs of the implemented actions. (C) 2015 Elsevier Ltd. All rights reserved.
机构:
Univ Stuttgart, Grad & Res Sch Efficient Use Energy Stuttgart GRE, DE-70565 Stuttgart, Germany
Univ Stuttgart, Inst Energy Econ & Rat Use Energy IER, DE-70565 Stuttgart, GermanyUniv Stuttgart, Grad & Res Sch Efficient Use Energy Stuttgart GRE, DE-70565 Stuttgart, Germany
Brunke, Jean-Christian
;
Blesl, Markus
论文数: 0引用数: 0
h-index: 0
机构:
Univ Stuttgart, Inst Energy Econ & Rat Use Energy IER, DE-70565 Stuttgart, GermanyUniv Stuttgart, Grad & Res Sch Efficient Use Energy Stuttgart GRE, DE-70565 Stuttgart, Germany
机构:
Univ Kufa, Dept Mech Engn, Fac Engn, Kufa Najaf 21, Iraq
Univ Malaya, UM Power Energy Dedicated Adv Ctr UMPEDAC, Kuala Lumpur 59990, MalaysiaUniv Kufa, Dept Mech Engn, Fac Engn, Kufa Najaf 21, Iraq
Madlool, N. A.
;
Saidur, R.
论文数: 0引用数: 0
h-index: 0
机构:
Univ Malaya, Dept Mech Engn, Fac Engn, Kuala Lumpur 50603, Malaysia
Univ Malaya, UM Power Energy Dedicated Adv Ctr UMPEDAC, Kuala Lumpur 59990, MalaysiaUniv Kufa, Dept Mech Engn, Fac Engn, Kufa Najaf 21, Iraq
Saidur, R.
;
论文数: 引用数:
h-index:
机构:
Rahim, N. A.
;
Kamalisarvestani, M.
论文数: 0引用数: 0
h-index: 0
机构:
Univ Malaya, Dept Mech Engn, Fac Engn, Kuala Lumpur 50603, MalaysiaUniv Kufa, Dept Mech Engn, Fac Engn, Kufa Najaf 21, Iraq
机构:
Univ Stuttgart, Grad & Res Sch Efficient Use Energy Stuttgart GRE, DE-70565 Stuttgart, Germany
Univ Stuttgart, Inst Energy Econ & Rat Use Energy IER, DE-70565 Stuttgart, GermanyUniv Stuttgart, Grad & Res Sch Efficient Use Energy Stuttgart GRE, DE-70565 Stuttgart, Germany
Brunke, Jean-Christian
;
Blesl, Markus
论文数: 0引用数: 0
h-index: 0
机构:
Univ Stuttgart, Inst Energy Econ & Rat Use Energy IER, DE-70565 Stuttgart, GermanyUniv Stuttgart, Grad & Res Sch Efficient Use Energy Stuttgart GRE, DE-70565 Stuttgart, Germany
机构:
Univ Kufa, Dept Mech Engn, Fac Engn, Kufa Najaf 21, Iraq
Univ Malaya, UM Power Energy Dedicated Adv Ctr UMPEDAC, Kuala Lumpur 59990, MalaysiaUniv Kufa, Dept Mech Engn, Fac Engn, Kufa Najaf 21, Iraq
Madlool, N. A.
;
Saidur, R.
论文数: 0引用数: 0
h-index: 0
机构:
Univ Malaya, Dept Mech Engn, Fac Engn, Kuala Lumpur 50603, Malaysia
Univ Malaya, UM Power Energy Dedicated Adv Ctr UMPEDAC, Kuala Lumpur 59990, MalaysiaUniv Kufa, Dept Mech Engn, Fac Engn, Kufa Najaf 21, Iraq
Saidur, R.
;
论文数: 引用数:
h-index:
机构:
Rahim, N. A.
;
Kamalisarvestani, M.
论文数: 0引用数: 0
h-index: 0
机构:
Univ Malaya, Dept Mech Engn, Fac Engn, Kuala Lumpur 50603, MalaysiaUniv Kufa, Dept Mech Engn, Fac Engn, Kufa Najaf 21, Iraq