RESOURCE-ALLOCATION IN A PERT NETWORK UNDER CONTINUOUS ACTIVITY TIME-COST FUNCTIONS

被引:53
作者
BERMAN, EB
机构
关键词
D O I
10.1287/mnsc.10.4.734
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:734 / 745
页数:12
相关论文
共 8 条
[1]  
ALPERT L, 1962, ORI TP12
[2]  
BECKWITH RE, 1961, COST CONTROL EXTENSI
[3]   A NETWORK FLOW COMPUTATION FOR PROJECT COST CURVES [J].
FULKERSON, DR .
MANAGEMENT SCIENCE, 1961, 7 (02) :167-178
[4]   CRITICAL-PATH PLANNING AND SCHEDULING - MATHEMATICAL BASIS [J].
KELLEY, JE .
OPERATIONS RESEARCH, 1961, 9 (03) :296-320
[5]   COST-FUNCTIONS FOR SYSTEMS WITH SPARE COMPONENTS [J].
MORRISON, DF .
OPERATIONS RESEARCH, 1961, 9 (05) :688-694
[6]  
SALVESON ME, 1961, NAVAL RES LOGISTICS, V8
[7]  
VAZSONYI A, 1961, MAY W JOINT COMP C L
[8]  
Walker, 1959, P E JOINT COMP C, P160, DOI [10.1145/1460299.1460318, DOI 10.1145/1460299.1460318]