SETTING PLANNED LEADTIMES IN SERIAL PRODUCTION SYSTEMS WITH TARDINESS COSTS

被引:108
作者
YANO, CA
机构
关键词
D O I
10.1287/mnsc.33.1.95
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:95 / 106
页数:12
相关论文
共 8 条
[1]   A SIMULATION-BASED EXPERIMENTAL INVESTIGATION OF SUPPLY TIMING UNCERTAINTY IN MRP SYSTEMS [J].
GRASSO, ET ;
TAYLOR, BW .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1984, 22 (03) :485-497
[2]  
KANET JJ, 1984, INT J PROD RES, V22, P41, DOI 10.1080/00207548408942428
[3]  
REES LP, 1985, DYNAMICALLY ADJUSTIN
[4]  
WEEKS JK, 1981, 21 ANN C P AM PROD I, P177
[5]  
Whybark D.C., 1976, DECISION SCI, V7, P595, DOI DOI 10.1111/J.1540-5915.1976.TB00704.X
[6]  
YANO CA, 1985, 8527 U MICH DEP IND
[7]  
YANO CA, 1985, 8516 U MICH DEP IND
[8]  
YANO CA, 1985, 8517 U MICH DEP IND