MULTIPROCESSOR SCHEDULING - COMBINING LPT AND MULTIFIT

被引:56
作者
LEE, CY
MASSEY, JD
机构
[1] Univ of Florida, Gainesville, FL,, USA, Univ of Florida, Gainesville, FL, USA
关键词
in part by the NSF Grant DMC-8504786;
D O I
10.1016/0166-218X(88)90079-0
中图分类号
O29 [应用数学];
学科分类号
070104 ;
摘要
9
引用
收藏
页码:233 / 242
页数:10
相关论文
共 9 条
[1]  
[Anonymous], 1969, SIAM J APPL MATH
[2]  
COFFMAN EG, 1978, SIAM J COMPUT, V7, P1, DOI 10.1137/0207001
[3]  
ELMAGHRABY SE, 1980, AIIE T, V12, P87
[4]   TIGHTER BOUNDS FOR THE MULTIFIT PROCESSOR SCHEDULING ALGORITHM [J].
FRIESEN, DK .
SIAM JOURNAL ON COMPUTING, 1984, 13 (01) :170-181
[5]   EVALUATION OF A MULTIFIT-BASED SCHEDULING ALGORITHM [J].
FRIESEN, DK ;
LANGSTON, MA .
JOURNAL OF ALGORITHMS, 1986, 7 (01) :35-59
[6]  
Garey MR., 1979, COMPUTERS INTRACTABI
[7]   BOUNDS FOR CERTAIN MULTIPROCESSING ANOMALIES [J].
GRAHAM, RL .
BELL SYSTEM TECHNICAL JOURNAL, 1966, 45 (09) :1563-+
[8]  
HOCHBAUM DS, 1985, 12TH INT S MATH PROG
[9]  
LEE CY, 1986, 869 U FLOR DEP IND S