THE RELATED ACTIVITY CONCEPT IN ASSEMBLY LINE BALANCING

被引:21
作者
AGRAWAL, PK
机构
关键词
D O I
10.1080/00207548508904717
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
引用
收藏
页码:403 / 421
页数:19
相关论文
共 24 条
[1]  
ARCUS AL, 1962, ASSEMBLY LINE BALANC
[2]   INTERSTAGE BUFFER STORAGE CAPACITY OF NON-POWERED ASSEMBLY LINES - SIMPLE MATHEMATICAL APPROACH [J].
BASU, RN .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1977, 15 (04) :365-382
[3]   ASSEMBLY-LINE BALANCING BY LINEAR-PROGRAMMING [J].
BOWMAN, EH .
OPERATIONS RESEARCH, 1960, 8 (03) :385-389
[4]  
Buxey G. M., 1976, INT J PROD RES, V14, P607
[5]   ASSEMBLY LINE BALANCING WITH MULTIPLE STATIONS [J].
BUXEY, GM .
MANAGEMENT SCIENCE SERIES B-APPLICATION, 1974, 20 (06) :1010-1021
[6]  
Dar-El E. M., 1975, AIIE Transactions, V7, P302, DOI 10.1080/05695557508975011
[7]   ASSEMBLY-LINE BALANCING - DYNAMIC-PROGRAMMING WITH PRECEDENCE CONSTRAINTS [J].
HELD, M ;
KARP, RM ;
SHARESHIAN, R .
OPERATIONS RESEARCH, 1963, 11 (03) :442-459
[8]  
Helgeson WB, 1961, J IND ENG, V12, P394
[9]   OPTIMAL ALLOCATION OF WORK IN SYMMETRICALLY UN-BALANCED PRODUCTION LINE SYSTEMS WITH VARIABLE OPERATION TIMES [J].
HILLIER, FS ;
BOLING, RW .
MANAGEMENT SCIENCE, 1979, 25 (08) :721-728
[10]  
IGNALL EJ, 1965, J IND ENGINEERING, V16, P244