MINIMIZING THE WEIGHTED SUM OF LATE AND EARLY COMPLETION PENALTIES IN A SINGLE-MACHINE

被引:21
作者
AHMED, MU
SUNDARARAGHAVAN, PS
机构
[1] Information Systems and Operations Management Department, The University of Toledo, Toledo, OH
关键词
D O I
10.1080/07408179008964183
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We consider the problem of scheduling n jobs on a single machine so as to minimize weighted absolute deviation of completion times from their due dates. The general problem is NP-complete, but we show how to solve a special case. © 1990 Taylor & Francis Group, LLC.
引用
收藏
页码:288 / 290
页数:3
相关论文
共 14 条
[1]   MINIMIZING MEAN ABSOLUTE DEVIATION OF COMPLETION TIMES ABOUT A COMMON DUE DATE [J].
BAGCHI, U ;
SULLIVAN, RS ;
CHANG, YL .
NAVAL RESEARCH LOGISTICS, 1986, 33 (02) :227-240
[2]  
Baker K., 1974, INTRO SEQUENCING SCH
[3]  
Conway R, 1967, THEORY SCHEDULING
[4]   MINIMIZING WAITING TIME VARIANCE IN SINGLE MACHINE PROBLEM [J].
EILON, S ;
CHOWDHURY, IG .
MANAGEMENT SCIENCE, 1977, 23 (06) :567-575
[5]   THE LAGRANGIAN-RELAXATION METHOD FOR SOLVING INTEGER PROGRAMMING-PROBLEMS [J].
FISHER, ML .
MANAGEMENT SCIENCE, 1981, 27 (01) :1-18
[6]   ONE-PROCESSOR SCHEDULING WITH SYMMETRIC EARLINESS AND TARDINESS PENALTIES [J].
GAREY, MR ;
TARJAN, RE ;
WILFONG, GT .
MATHEMATICS OF OPERATIONS RESEARCH, 1988, 13 (02) :330-348
[8]   VARIANCE MINIMIZATION IN SINGLE MACHINE SEQUENCING PROBLEMS [J].
MERTEN, AG ;
MULLER, ME .
MANAGEMENT SCIENCE SERIES A-THEORY, 1972, 18 (09) :518-528
[9]   COMMON DUE DATE ASSIGNMENT TO MINIMIZE TOTAL PENALTY FOR THE ONE MACHINE SCHEDULING PROBLEM [J].
PANWALKAR, SS ;
SMITH, ML ;
SEIDMANN, A .
OPERATIONS RESEARCH, 1982, 30 (02) :391-399
[10]  
Rinnooy Kan AHG, 1976, MACHINE SCHEDULING P