INTEGRATED DAYS OFF AND SHIFT PERSONNEL SCHEDULING

被引:63
作者
BAILEY, J
机构
[1] Arizona State Univ, Tempe, AZ, USA, Arizona State Univ, Tempe, AZ, USA
关键词
INTEGRATED DAYS OFF - LINEAR PROGRAMMING;
D O I
10.1016/0360-8352(85)90027-0
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The two levels of personnel scheduling, that is, determination of the days an employee should work and determination of the time an employee should start each workday, are integrated. The integration allows constraints involving hourly fluctuations in demand and fixed work force size to interact. the objective is to minimize the cost of premium pay plus customer invonvenience due to understaffing. an optimal solution is attained via linear programming. In a realistic service system environment, the model outperformed an integrating heuristic by 13. 56%.
引用
收藏
页码:395 / 404
页数:10
相关论文
共 21 条
[1]   SCHEDULING A FULL-TIME WORKFORCE TO MEET CYCLIC STAFFING REQUIREMENTS [J].
BAKER, KR .
MANAGEMENT SCIENCE SERIES B-APPLICATION, 1974, 20 (12) :1561-1568
[2]   WORKFORCE ALLOCATION IN CYCLICAL SCHEDULING PROBLEMS - SURVEY [J].
BAKER, KR .
OPERATIONAL RESEARCH QUARTERLY, 1976, 27 (01) :155-167
[3]   WORKFORCE SCHEDULING WITH CYCLIC DEMANDS AND DAY-OFF CONSTRAINTS [J].
BAKER, KR ;
MAGAZINE, MJ .
MANAGEMENT SCIENCE, 1977, 24 (02) :161-167
[4]  
BAKER KR, 1979, AIIE T, V11, P286, DOI 10.1080/05695557908974473
[5]  
BAKER KR, 1979, AIIE T, V11, P79
[6]   CYCLIC SCHEDULING VIA INTEGER PROGRAMS WITH CIRCULAR ONES [J].
BARTHOLDI, JJ ;
ORLIN, JB ;
RATLIFF, HD .
OPERATIONS RESEARCH, 1980, 28 (05) :1074-1085
[7]  
BROWNE JJ, 1979, IND ENG, V11, P27
[8]  
BUFFA ES, 1980, MODERN PRODUCTION OP
[9]  
Dantzig G, 1954, OPER RES, V2, P339, DOI [10.1287/opre.2.3.339, DOI 10.1287/OPRE.2.3.339]
[10]  
FIELD J, 1983, THESIS ARIZONA STATE