共 10 条
[1]
Crowston W. B., 1972, AIIE T, V4, P313
[2]
ECONOMIC LOT SIZE DETERMINATION IN MULTI-STAGE ASSEMBLY SYSTEMS
[J].
MANAGEMENT SCIENCE SERIES A-THEORY,
1973, 19 (05)
:517-527
[3]
DREZNER Z, 1982, MCMASTER U RES WORKI, V184, P1
[4]
Jensen P. A., 1972, AIIE T, V4, P126
[5]
OPTIMAL AND SYSTEM MYOPIC POLICIES FOR MULTI-ECHELON PRODUCTION-INVENTORY ASSEMBLY SYSTEMS
[J].
MANAGEMENT SCIENCE SERIES A-THEORY,
1975, 21 (11)
:1285-1294
[7]
OPTIMIZING MULTISTAGE PRODUCTION WITH CONSTANT LOT SIZE AND VARYING NUMBERS OF BATCHES
[J].
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE,
1980, 8 (06)
:623-629
[9]
Taha H, 1970, AIIE T, P157