MULTI-STAGE PRODUCTION WITH VARIABLE LOT SIZES AND TRANSPORTATION OF PARTIAL LOTS

被引:12
作者
DREZNER, Z [1 ]
SZENDROVITS, AZ [1 ]
WESOLOWSKY, GO [1 ]
机构
[1] MCMASTER UNIV,FAC BUSINESS,HAMILTON L8S 4M4,ONTARIO,CANADA
关键词
D O I
10.1016/0377-2217(84)90237-6
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:227 / 237
页数:11
相关论文
共 10 条
[1]  
Crowston W. B., 1972, AIIE T, V4, P313
[2]   ECONOMIC LOT SIZE DETERMINATION IN MULTI-STAGE ASSEMBLY SYSTEMS [J].
CROWSTON, WB ;
WAGNER, M ;
WILLIAMS, JF .
MANAGEMENT SCIENCE SERIES A-THEORY, 1973, 19 (05) :517-527
[3]  
DREZNER Z, 1982, MCMASTER U RES WORKI, V184, P1
[4]  
Jensen P. A., 1972, AIIE T, V4, P126
[5]   OPTIMAL AND SYSTEM MYOPIC POLICIES FOR MULTI-ECHELON PRODUCTION-INVENTORY ASSEMBLY SYSTEMS [J].
SCHWARZ, LB ;
SCHRAGE, L .
MANAGEMENT SCIENCE SERIES A-THEORY, 1975, 21 (11) :1285-1294
[6]   MANUFACTURING CYCLE TIME DETERMINATION FOR A MULTISTAGE ECONOMIC PRODUCTION QUANTITY MODEL [J].
SZENDROVITS, AZ .
MANAGEMENT SCIENCE, 1975, 22 (03) :298-308
[7]   OPTIMIZING MULTISTAGE PRODUCTION WITH CONSTANT LOT SIZE AND VARYING NUMBERS OF BATCHES [J].
SZENDROVITS, AZ ;
DREZNER, Z .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1980, 8 (06) :623-629
[8]   OPTIMALITY OF SUB-BATCH SIZES FOR A MULTISTAGE EPQ MODEL - REJOINDER [J].
SZENDROVITS, AZ .
MANAGEMENT SCIENCE, 1976, 23 (03) :334-338
[9]  
Taha H, 1970, AIIE T, P157
[10]   RESEARCH PORTFOLIO FOR INVENTORY MANAGEMENT AND PRODUCTION PLANNING SYSTEMS [J].
WAGNER, HM .
OPERATIONS RESEARCH, 1980, 28 (03) :445-475