A DYNAMIC JOB-SHOP SCHEDULING FRAMEWORK - A BACKWARD APPROACH

被引:26
作者
SUN, D [1 ]
LIN, L [1 ]
机构
[1] SUNY BUFFALO,DEPT IND ENGN,BUFFALO,NY 14260
关键词
D O I
10.1080/00207549408956982
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We address two infrequently studied problems in scheduling research, i.e. the problems of dynamic scheduling and integration of a job shop and its environment. A dynamic scheduling framework is presented in which dynamic scheduling is carried out through solving a series of static backward scheduling problems. The framework facilitates the integration by establishing the relationship between scheduling, due-date assignment and job release times through backward scheduling. A rolling time window approach is adopted to decompose the scheduling problem in time dimension and accommodate the dynamic conditions in a job shop.
引用
收藏
页码:967 / 985
页数:19
相关论文
共 18 条
[1]  
Adams J., Balas E., Zawack D., Management Science, 34, pp. 391-401, (1983)
[2]  
Applegate D., Cook W., ORSA Journal on Computing, 3, pp. 149-156, (1991)
[3]  
Balas E., Operations Research, 17, pp. 941-957, (1969)
[4]  
Baker K.R., Introduction to Sequencing and Scheduling, (1974)
[5]  
Baker K.R., Bertrand J., Journal of Operations Management, 1, pp. 109-120, (1981)
[6]  
Blackstone J.H., Phillips D.T., Hogg G.L., International Journal of Production Research, 20, pp. 27-45, (1982)
[7]  
Carlier J., Pinson E., Management Science, 35, pp. 164-176, (1989)
[8]  
Cheng T., International Journal of Production Research, 24, pp. 503-505, (1986)
[9]  
Church L.K., Uzsoy R., International Journal of Computer Integrated Manufacturing, 5, pp. 153-163, (1992)
[10]  
Conway R.W., Maxwell W.L., Miller L.W., Theory of Scheduling, (1967)