DETERMINATION OF COMPLETION TIMES FOR SERIAL MULTIPRODUCT PROCESSES .1. A 2 UNIT FINITE INTERMEDIATE STORAGE-SYSTEM

被引:11
作者
WIEDE, W
KURIYAN, K
REKLAITIS, GV
机构
[1] School of Chemical Engineering, Purdue University, West Lafayette, IN 47907, United States
关键词
Acknowledgement-Thiws ork was supportedi n part by National ScienceF oundationG rant No. CPE-7924565;
D O I
10.1016/0098-1354(87)85015-9
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
10
引用
收藏
页码:337 / 344
页数:8
相关论文
共 11 条
[1]  
COFFMAN EG, 1978, SIAM J COMPUT, V7, P1, DOI 10.1137/0207001
[2]   EVALUATION OF FLOW SHOP SEQUENCING HEURISTICS [J].
DANNENBRING, DG .
MANAGEMENT SCIENCE, 1977, 23 (11) :1174-1182
[3]   SEQUENCING 2-MACHINE FLOW-SHOPS WITH FINITE INTERMEDIATE STORAGE [J].
DUTTA, SK ;
CUNNINGHAM, AA .
MANAGEMENT SCIENCE SERIES A-THEORY, 1975, 21 (09) :989-996
[4]  
Garey MR., 1979, COMPUTERS INTRACTABI
[5]  
GILMORE PC, 1964, OPL RES Q, V12, P323
[6]  
GILMORE PC, 1979, ANN DISCRETE MATH, V5, P287
[7]  
Graham R. L., 1979, Discrete Optimisation, P287
[8]  
JOHNSON SM, 1954, NAV RES LOGIST, V28, P61
[9]   FLOWSHOP SCHEDULING WITH LIMITED TEMPORARY-STORAGE [J].
PAPADIMITRIOU, CH ;
KANELLAKIS, PC .
JOURNAL OF THE ACM, 1980, 27 (03) :533-549
[10]   FLOW-SHOP SEQUENCING PROBLEM WITH NO WAIT IN PROCESS [J].
REDDI, SS ;
RAMAMOORTHY, CV .
OPERATIONAL RESEARCH QUARTERLY, 1972, 23 (03) :323-+