TIME STEP VS DYNAMIC OPTIMIZATION OF GENERATION-CAPACITY-EXPANSION PROGRAMS OF POWER-SYSTEMS

被引:12
作者
LEVIN, N
TISHLER, A
ZAHAVI, J
机构
关键词
D O I
10.1287/opre.31.5.891
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:891 / 914
页数:24
相关论文
共 20 条
[1]   MODELS FOR DETERMINING LEAST-COST INVESTMENTS IN ELECTRICITY SUPPLY [J].
ANDERSON, D .
BELL JOURNAL OF ECONOMICS AND MANAGEMENT SCIENCE, 1972, 3 (01) :267-299
[2]  
Bamberger J., 1974, PROGR REPORT LOGO MU
[3]  
BERRIE TW, 1968, PUBLIC ENTERPRISE
[4]  
Bessiere F., 1970, MANAGE SCI, V17, P192
[5]  
BLOOM JA, 1978, MIT154 OP RES CTR TE
[6]  
CAZALET EG, 1970, DECOMPOSITION COMPLE
[7]  
DAY RH, 1974, AM ECON REV, V64, P11
[8]  
*EL POW RES I, 1981, EA1964 REP, V3
[9]  
GATELY D, 1970, 7035 U W ONT DEP EC
[10]  
*GE, 1979, OPT GEN PLANN PROGR