摘要
The effects of the presence of both demand and lead time uncertainties on material requirements planning systems performance are investigated. A simulation model of a multi-level product environment is employed to evaluate the influence of these combined uncertainties in a rolling planning horizon. Their interaction with product structure variables, cost ratios and lot-sizing rules is also explored. Finally, by means of statistical analysis of the simulation output, hypotheses relating to various variables and their interactions are formed and tested. The results highlight the significant differences between uncertain and deterministic environments.
引用
收藏
页码:1689 / 1707
页数:19
相关论文
共 29 条
[1]  
Bahl H.C., Ritzman L.P., Gupta J., Determining lot sizes and resource requirements: A review, Operations Research, 35, 3, pp. 329-345, (1987)
[2]  
Benton W.C., Srivastava R., Product structure complexity and multilevel lot-sizing using alternative costing policies, Decision Sciences, 16, 4, pp. 357-369, (1985)
[3]  
Biggs J.R., Heuristic lot-sizing and sequencing rules in a multistage production inventory system, Decision Sciences, 10, 1, pp. 96-115, (1979)
[4]  
Biggs J.R., Goodman S.H., Hardy S.T., Lot-sizing rules in a hierarchical multistage inventory system, Production and Inventory Management Journal, 18, 1, (1977)
[5]  
Blackburn J.D., Kropp D.H., Millen R.A., Acomparison of strategies to dampen nervousness in MRP systems, Management Science, 32, 4, pp. 413-429, (1986)
[6]  
Blackburn J.D., Millen R.A., Improved heuristics for multi-stage requirements planning systems, Management Science, 28, 1, pp. 44-56, (1982)
[7]  
Blackburn J.D., Millen R.A., The impact of a rolling schedule in a multi-level MRP system, Journal of Operations Management, 2, 2, pp. 125-135, (1982)
[8]  
Brennan L., Gupta S.M., Simulation of Uncertainty and Product Structure in MRP: Computer Integrated Manufacturing Systems and Robotics, pp. 39-43, (1987)
[9]  
Chalmet L.G., Debodt M., Van Wassenhove L., The effectof engineering changes and demand uncertainty on MRP lot sizing: A case study, International Journal of Production Research, 23, 2, pp. 233-251, (1985)
[10]  
Chang C.A., The interchangeability of safety stocks and safety lead time, Journal of Operations Management, 6, 1, pp. 35-42, (1986)