共 29 条
[1]
Bahl H.C., Ritzman L.P., Gupta J., Determining lot sizes and resource requirements: A review, Operations Research, 35, 3, pp. 329-345, (1987)
[2]
Benton W.C., Srivastava R., Product structure complexity and multilevel lot-sizing using alternative costing policies, Decision Sciences, 16, 4, pp. 357-369, (1985)
[3]
Biggs J.R., Heuristic lot-sizing and sequencing rules in a multistage production inventory system, Decision Sciences, 10, 1, pp. 96-115, (1979)
[4]
Biggs J.R., Goodman S.H., Hardy S.T., Lot-sizing rules in a hierarchical multistage inventory system, Production and Inventory Management Journal, 18, 1, (1977)
[5]
Blackburn J.D., Kropp D.H., Millen R.A., Acomparison of strategies to dampen nervousness in MRP systems, Management Science, 32, 4, pp. 413-429, (1986)
[6]
Blackburn J.D., Millen R.A., Improved heuristics for multi-stage requirements planning systems, Management Science, 28, 1, pp. 44-56, (1982)
[7]
Blackburn J.D., Millen R.A., The impact of a rolling schedule in a multi-level MRP system, Journal of Operations Management, 2, 2, pp. 125-135, (1982)
[8]
Brennan L., Gupta S.M., Simulation of Uncertainty and Product Structure in MRP: Computer Integrated Manufacturing Systems and Robotics, pp. 39-43, (1987)
[9]
Chalmet L.G., Debodt M., Van Wassenhove L., The effectof engineering changes and demand uncertainty on MRP lot sizing: A case study, International Journal of Production Research, 23, 2, pp. 233-251, (1985)
[10]
Chang C.A., The interchangeability of safety stocks and safety lead time, Journal of Operations Management, 6, 1, pp. 35-42, (1986)