共 13 条
[1]
BERGSTROM GL, 1970, MANAGE SCI B-APPL, V16, pB614
[2]
CHANG R. H., 1970, AIIE T, V2, P326
[3]
Elmaleh J., 1974, INT J PROD RES, V12, P673
[4]
GUNTHER HO, 1981, 2ND INT WORK SEM PRO
[5]
NOTE ON BERGSTROM-SMITH MULTI-ITEM PRODUCTION PLANNING MODEL
[J].
MANAGEMENT SCIENCE SERIES A-THEORY,
1971, 17 (11)
:783-785
[6]
HAX AC, 1974, MANAGEMENT SCI DEC
[7]
Holt C.C., 1960, PLANNING PRODUCTION
[8]
THE PRODUCTION SWITCHING HEURISTIC UNDER NONSTATIONARY DEMAND
[J].
ENGINEERING COSTS AND PRODUCTION ECONOMICS,
1982, 7 (01)
:55-61
[10]
OGRADY PJ, 1981, THESIS U NOTTINGHAM