OPTIMAL TIMING, SEQUENCING, AND SIZING OF MULTIPLE RESERVOIR SURFACE WATER SUPPLY FACILITIES

被引:31
作者
BECKER, L [1 ]
YEH, WWG [1 ]
机构
[1] UNIV CALIF,DEPT ENGN SYST,LOS ANGELES,CA 90024
关键词
D O I
10.1029/WR010i001p00057
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
引用
收藏
页码:57 / 62
页数:6
相关论文
共 18 条
[1]  
[Anonymous], WATER RESOURCES SYST
[2]   USE OF MONTE CARLO TECHNIQUES IN DESIGN AND OPERATION OF A MULTIPURPOSE RESERVOIR SYSTEM [J].
ASKEW, AJ ;
YEH, WWG ;
HALL, WA .
WATER RESOURCES RESEARCH, 1971, 7 (04) :819-&
[3]  
Bower B. T., 1962, DESIGN WATER RESOURC
[4]   DYNAMIC PROGRAMING FOR OPTIMAL SEQUENCING OF WATER SUPPLY PROJECTS [J].
BUTCHER, WS ;
HAIMES, YY ;
HALL, WA .
WATER RESOURCES RESEARCH, 1969, 5 (06) :1196-&
[5]  
BUTSCH RJ, 1970, J HYDR DIV ASCE, V96, P125
[6]   CHANCE CONSTRAINED RESERVOIR MODEL [J].
EISEL, LM .
WATER RESOURCES RESEARCH, 1972, 8 (02) :339-&
[7]   SEQUENCING OF INTERDEPENDENT HYDROELECTRIC PROJECTS [J].
ERLENKOTTER, D .
WATER RESOURCES RESEARCH, 1973, 9 (01) :21-27
[8]  
Gablinger M., 1970, J HYDRAULICS DIVISIO, V96, P165
[9]  
Hall W., 1969, 130 U CAL WAT RES CT
[10]   USE OF CRITICAL PERIOD IN RESERVOIR ANALYSIS [J].
HALL, WA ;
ASKEW, AJ ;
YEH, WWG .
WATER RESOURCES RESEARCH, 1969, 5 (06) :1205-&