共 23 条
[1]
Allen M., 1963, IND SCHEDULING, P252
[2]
BAKER CT, 1960, MANAGE SCI, V6, P211
[3]
BUFFA ES, 1979, PRODUCTION INVENTORY, P492
[6]
LABOR FLEXIBILITY IN MULTIECHELON DUAL-CONSTRAINT JOB SHOPS
[J].
MANAGEMENT SCIENCE SERIES A-THEORY,
1974, 20 (07)
:1073-1080
[7]
EFFECTS OF SHOP SIZE AND LABOR FLEXIBILITY IN LABOR AND MACHINE LIMITED PRODUCTION SYSTEMS
[J].
MANAGEMENT SCIENCE SERIES A-THEORY,
1975, 21 (05)
:507-515
[8]
FRYER JS, 1976, DECISION SCI, V7, P725
[9]
FRYER JS, 1973, MANAGE SCI, V10, P1001
[10]
Hogg G. L., 1975, AIIE Transactions, V7, P100, DOI 10.1080/05695557508974992