WORKLOAD VS SCHEDULING POLICIES IN A DUAL-RESOURCE CONSTRAINED JOB SHOP

被引:20
作者
HUANG, PY
MOORE, LJ
RUSSELL, RS
机构
关键词
D O I
10.1016/0305-0548(84)90006-6
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
引用
收藏
页码:37 / 47
页数:11
相关论文
共 23 条
[1]  
Allen M., 1963, IND SCHEDULING, P252
[2]  
BAKER CT, 1960, MANAGE SCI, V6, P211
[3]  
BUFFA ES, 1979, PRODUCTION INVENTORY, P492
[4]   NETWORK DISPATCHING BY THE SHORTEST-OPERATION DISCIPLINE [J].
CONWAY, RW ;
MAXWELL, WL .
OPERATIONS RESEARCH, 1962, 10 (01) :51-73
[5]   REVIEW OF SEQUENCING RESEARCH [J].
DAY, JE ;
HOTTENSTEIN, MP .
NAVAL RESEARCH LOGISTICS QUARTERLY, 1970, 17 (01) :11-+
[6]   LABOR FLEXIBILITY IN MULTIECHELON DUAL-CONSTRAINT JOB SHOPS [J].
FRYER, JS .
MANAGEMENT SCIENCE SERIES A-THEORY, 1974, 20 (07) :1073-1080
[7]   EFFECTS OF SHOP SIZE AND LABOR FLEXIBILITY IN LABOR AND MACHINE LIMITED PRODUCTION SYSTEMS [J].
FRYER, JS .
MANAGEMENT SCIENCE SERIES A-THEORY, 1975, 21 (05) :507-515
[8]  
FRYER JS, 1976, DECISION SCI, V7, P725
[9]  
FRYER JS, 1973, MANAGE SCI, V10, P1001
[10]  
Hogg G. L., 1975, AIIE Transactions, V7, P100, DOI 10.1080/05695557508974992