AN APPROXIMATE METHOD FOR THE ANALYSIS OF UNCERTAINTY IN BENEFIT-COST RATIOS

被引:8
作者
DANDY, GC
机构
关键词
D O I
10.1029/WR021i003p00267
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
引用
收藏
页码:267 / 271
页数:5
相关论文
共 9 条
[1]  
Benjamin J. R., 1970, PROBABILITY STATISTI
[2]  
Cohon J., 1978, MULTIOBJECTIVE PROGR
[3]  
DENEUFVILLE R, 1974, SYSTEMS PLANNING DES
[4]   AN APPROACH TO RISK AND UNCERTAINTY IN BENEFIT-COST-ANALYSIS OF WATER-RESOURCES PROJECTS [J].
GOICOECHEA, A ;
KROUSE, MR ;
ANTLE, LG .
WATER RESOURCES RESEARCH, 1982, 18 (04) :791-799
[5]  
Goicoechea A., 1982, MULTIOBJECTIVE DECIS
[7]  
James L.D., 1971, EC WATER RESOURCES P
[8]  
MISHAM EJ, 1978, ELEMENTS COST BENEFI
[9]  
1979, FED REG, V44, P194