ATF HEAVY-ION BEAM PROBE - INSTALLATION AND INITIAL OPERATION

被引:18
作者
ZIELINSKI, JJ
ACETO, SC
CONNOR, KA
LEWIS, JF
GLOWIENKA, JC
HENKEL, GH
FEHLING, DT
DEVAN, WR
STONGE, KD
LEE, DK
CARNEVALI, A
机构
[1] OAK RIDGE NATL LAB,OAK RIDGE,TN 37831
[2] MARTIN MARIETTA CORP,ENERGY SYST,OAK RIDGE,TN 37831
[3] RANDOLPH MACON WOMANS COLL,LYNCHBURG,VA 24505
关键词
D O I
10.1063/1.1141739
中图分类号
TH7 [仪器、仪表];
学科分类号
0804 ; 080401 ; 081102 ;
摘要
Installation of the HIBP on ATF began in the summer of 1988. All of the major hardware components have now been installed. The initial operation of the diagnostic has begun amid the final stages of testing and control system integration. The existence of significant magnetic fields and gradients outside of the main plasma volume and fully three-dimensional particle trajectories have raised several interesting issues during the design, assembly, alignment, and operation of the beamline and analyzer. The diagnostic must function in a challenging environment. It must perform satisfactorily despite electrical interference from several nearby sources, pressure excursions caused by gas puffing, and UV/plasma loading.
引用
收藏
页码:2961 / 2963
页数:3
相关论文
共 4 条
[1]   ENERGY ANALYZER FOR THE ATF HEAVY-ION BEAM PROBE [J].
ACETO, SC ;
CONNOR, KA ;
MCLAREN, PE ;
ZIELINSKI, JJ ;
SCHATZ, JG ;
HENKEL, GH .
REVIEW OF SCIENTIFIC INSTRUMENTS, 1990, 61 (10) :2958-2960
[2]   HEAVY-ION BEAM PROBE DIAGNOSTIC SYSTEMS FOR STELLARATORS [J].
CARNEVALI, A ;
MISIUM, JR ;
LEWIS, JF ;
CONNOR, KA .
REVIEW OF SCIENTIFIC INSTRUMENTS, 1986, 57 (08) :1822-1824
[3]   HEAVY-ION BEAM PROBE FOR THE ADVANCED TOROIDAL FACILITY [J].
CARNEVALI, A ;
CONNOR, KA ;
ACETO, SC ;
LEWIS, JF ;
GLOWIENKA, JC ;
SHIPLEY, D ;
EBERLE, C .
REVIEW OF SCIENTIFIC INSTRUMENTS, 1988, 59 (08) :1670-1672
[4]  
ZIELINSKI JJ, 1989, 1989 IEEE INT C PLAS