Selection of roadheaders by fuzzy multiple attribute decision making method

被引:5
作者
Acaroglu, O. [1 ]
Feridunoglu, C. [1 ]
Tumac, D. [1 ]
机构
[1] Istanbul Tech Univ, Min Fac, Min Engn Dept, Istanbul, Turkey
来源
TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY | 2006年 / 115卷 / 03期
关键词
Roadheader; Selection criteria; Fuzzy multiple attribute decision making methods; Yager's method;
D O I
10.1179/174328606X128723
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
Planning/design decision problems affect the productivity in mining and construction sectors directly. Selection of the most suitable roadheader (boom type tunnelling machine) for the galleries/tunnels to be excavated in certain rock and under known project conditions is important not to meet problems during application. The present paper presents a fuzzy multiple attribute decision making as an innovative tool for the selection of roadheaders. A Turkish coal basin has been selected as practice area to show how a fuzzy multiple attribute decision making method will be used in the selection of roadheaders. First the criteria that might be effective during the selection of such machinery were set and then most suitable machine was determined by using Yager's method which is one of the fuzzy multiple attribute decision making methods. To conclude, the present study reveals that decision making methods can be used in the process of selecting excavation machines such as roadheaders for the excavation of galleries.
引用
收藏
页码:91 / 98
页数:8
相关论文
共 30 条
[1]   A new method to evaluate roadheader operational stability [J].
Acaroglu, O ;
Ergin, H .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2006, 21 (02) :172-179
[2]   The effect of cutting head shapes on roadheader stability [J].
Acaroglu, O. ;
Ergin, H. .
TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY, 2005, 114 (03) :140-146
[3]  
Acaroglu O., 2004, THESIS ISTANBUL TU M
[4]  
Aydin Y, 2001, PROCEEDINGS OF THE SEVENTEENTH INTERNATIONAL MINING CONGRESS AND EXHIBITION OF TURKEY, P567
[5]  
Aydin Y., 2000, P 12 COAL C TURK ER, P117
[6]  
Bandopadhyay S, 1987, INT J MIN GEOL ENG, V5, P149
[7]   An application of the analytic hierarchy process in equipment selection at Orhaneli open pit coal mine [J].
Bascetin, A .
TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY, 2004, 113 (03) :192-199
[8]  
BELLMAN RE, 1970, MANAGE SCI B-APPL, V17, pB141
[9]  
Bilgin N, 1996, EUROCK '96/TORINO/ITALY - PREDICTION AND PERFORMANCE IN ROCK MECHANICS AND ROCK ENGINEERING, PROCEEDINGS, VOLS 1 AND 2, P715
[10]  
Breeds C. D., 1992, MINING ENG HDB