共 14 条
[1]
BOMBERGER E, 1966, MANAGE SCI, V12, P778
[2]
COFFMAN EG, 1978, SIAM J COMPUT, V7, P1, DOI 10.1137/0207001
[3]
ITERATIVE PROCEDURE FOR SINGLE-MACHINE MULTI-PRODUCT LOT SCHEDULING PROBLEM
[J].
MANAGEMENT SCIENCE SERIES A-THEORY,
1973, 20 (01)
:50-55
[5]
ELMAGHRABY SE, 1980, AIIE T, V12, P87
[6]
APPLICATION OF MARGINAL ANALYSIS TO THE ECONOMIC LOT SCHEDULING PROBLEM
[J].
AIIE TRANSACTIONS,
1978, 10 (04)
:354-361
[7]
Goyal, 1975, INT J PROD RES, V13, P487
[9]
HAESSLER R, 1976, MANAGEMENT SCI, V22, P902
[10]
HAESSLER RW, 1979, AIIE T, V11, P336, DOI 10.1080/05695557908974480