APPLICATION OF BRANCH AND BOUND TECHNIQUE TO SOME FLOW-SHOP SCHEDULING PROBLEMS

被引:352
作者
IGNALL, E
SCHRAGE, L
机构
关键词
D O I
10.1287/opre.13.3.400
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:400 / &
相关论文
共 10 条
[1]  
BESSEL D, 1964, LPF LIST PROCESSING
[2]  
BROOKS GH, 1965, J IND ENGINEERING, V16, P34
[3]  
CONWAY RW, TO APPEAR
[4]   DEVELOPMENT OF M-STAGE DECISION RULE FOR SCHEDULING N JOBS THROUGH M MACHINES [J].
DUDEK, RA ;
TEUTON, OF .
OPERATIONS RESEARCH, 1964, 12 (03) :471-&
[5]   APPROXIMATE SOLUTIONS TO 3-MACHINE SCHEDULING PROBLEM [J].
GIGLIO, RJ ;
WAGNER, HM .
OPERATIONS RESEARCH, 1964, 12 (02) :305-&
[6]  
Johnson S. M., 1954, NAV RES LOGIST Q, V1, P61, DOI DOI 10.1002/NAV.3800010110
[7]  
JOHNSON SM, 1963, INDUSTRIAL SCHEDULIN, pCH2
[8]   AN AUTOMATIC METHOD OF SOLVING DISCRETE PROGRAMMING-PROBLEMS [J].
LAND, AH ;
DOIG, AG .
ECONOMETRICA, 1960, 28 (03) :497-520
[9]   AN ALGORITHM FOR THE TRAVELING SALESMAN PROBLEM [J].
LITTLE, JDC ;
MURTY, KG ;
SWEENEY, DW ;
KAREL, C .
OPERATIONS RESEARCH, 1963, 11 (06) :972-989
[10]  
MUTH JF, 1963, INDUSTRIAL SCHEDULIN, pCH2