AN INTERPRETATION OF GROUND MOVEMENTS RECORDED DURING CONSTRUCTION OF THE DONKIN-MORIEN TUNNEL

被引:58
作者
PELLI, F
KAISER, PK
MORGENSTERN, NR
机构
[1] LAURENTIAN UNIV,GEOMECH RES CTR,SUDBURY P3E 2C6,ONTARIO,CANADA
[2] UNIV ALBERTA,DEPT CIVIL ENGN,EDMONTON T6G 2G7,ALBERTA,CANADA
关键词
TUNNELING; MONITORING; TUNNEL BORING; BACK-ANALYSIS; NONLINEARITY;
D O I
10.1139/t91-030
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
A tunnel excavated by a tunnel boring machine was monitored extensively by means of extensometers installed near the tunnel face. Consequently, the three-dimensional state existing at the time of installation must be considered for the interpretation of the monitoring data. Results from three-dimensional finite element simulations are used to back-calculate rock mass strength and deformation properties. The purpose of this study was to establish and test various approaches of back-analysis. Results are compared with field and laboratory measurements. On the basis of these analyses, the paper provides guidance on how field data can be used for back-analysis purposes even when the ground behaves in a nonelastic manner.
引用
收藏
页码:239 / 254
页数:16
相关论文
共 20 条
[1]  
Barlow J, 1986, INTERPRETATION TUNNE
[2]  
BARLOW JP, 1987, 16TH P INT TUNN INT, V2, P787
[3]  
BIENIAWSKI ZT, 1984, ROCK MECHANICS DESIG
[4]  
Brown E. T., 1980, UNDERGROUND EXCAVATI
[5]  
DESAI CS, 1976, 2ND P INT C NUM MEHT, V2, P306
[7]   SCALE EFFECTS IN THE DETERMINATION OF ROCK MASS STRENGTH AND DEFORMABILITY [J].
HEUZE, FE .
ROCK MECHANICS, 1980, 12 (3-4) :167-192
[8]  
HOEK E, 1980, ASCE J GEOTECHNICAL, V106, P1013
[9]  
Hoek E, 1988, P 15 CAN ROCK MECH S, P31
[10]  
KAISER PK, 1991, COMPREHENSIVE ROCK M, V4, pCH26