MULTIITEM SCHEDULING BY BENDERS DECOMPOSITION

被引:6
作者
BAHL, HC [1 ]
ZIONTS, S [1 ]
机构
[1] SUNY BUFFALO, BUFFALO, NY 14260 USA
关键词
D O I
10.1057/jors.1987.195
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:1141 / 1148
页数:8
相关论文
共 17 条
[1]   COLUMN GENERATION BASED HEURISTIC ALGORITHM FOR MULTI-ITEM SCHEDULING [J].
BAHL, HC .
IIE TRANSACTIONS, 1983, 15 (02) :136-141
[2]  
Balas E., 1970, Integer and nonlinear programming, P385
[3]  
BENDERS JF, 1962, NUMER MATH, V4, P238, DOI [10.1007/BF01386316, DOI 10.1007/BF01386316, DOI 10.1007/S10287-004-0020-Y]
[4]   PRODUCTION SCHEDULING BY THE TRANSPORTATION METHOD OF LINEAR-PROGRAMMING [J].
BOWMAN, EH .
OPERATIONS RESEARCH, 1956, 4 (01) :100-103
[5]  
DEMMY WS, 1977, P C DISAGGREGATION P, P73
[6]   OPTIMAL PROGRAMMING OF LOT SIZES, INVENTORY AND LABOR ALLOCATIONS [J].
DZIELINSKI, BP ;
GOMORY, RE .
MANAGEMENT SCIENCE, 1965, 11 (09) :874-890
[7]   MULTICOMMODITY DISTRIBUTION SYSTEM-DESIGN BY BENDERS DECOMPOSITION [J].
GEOFFRION, AM ;
GRAVES, GW .
MANAGEMENT SCIENCE SERIES A-THEORY, 1974, 20 (05) :822-844
[8]   INTEGER PROGRAMMING ALGORITHMS - FRAMEWORK AND STATE-OF-ART SURVEY [J].
GEOFFRION, AM ;
MARSTEN, RE .
MANAGEMENT SCIENCE SERIES A-THEORY, 1972, 18 (09) :465-491
[9]  
LAMBRECHT MR, 1979, AIIE T, V11, P319, DOI 10.1080/05695557908974478
[10]  
LASDON L, 1970, OPTIMIZATION THEORY