JOINT LOT SIZING AND INSPECTION POLICY IN AN EOQ MODEL WITH RANDOM YIELD

被引:122
作者
ZHANG, X [1 ]
GERCHAK, Y [1 ]
机构
[1] UNIV WATERLOO,DEPT MANAGEMENT SCI,WATERLOO N2L 3G1,ONTARIO,CANADA
基金
加拿大自然科学与工程研究理事会;
关键词
D O I
10.1080/07408179008964156
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We study a joint lot sizing and inspection policy under an EOQ model where a random proportion of units are defective. Those units can be discovered only through costly inspections. The problem is thus bivariate:both lot size and fraction to inspect are to be chosen. We first analyze a model in which the only penalty for uninspected defectives is financial, and then consider a model where defective units cannot be used and thus must be replaced by non-defective ones. © 1990 Taylor & Francis Group, LLC.
引用
收藏
页码:41 / 47
页数:7
相关论文
共 11 条
[1]   OPTIMAL SCREENING PLANS FOR NONSERIAL PRODUCTION SYSTEMS [J].
BRITNEY, RR .
MANAGEMENT SCIENCE SERIES A-THEORY, 1972, 18 (09) :550-559
[3]  
GRECHAK Y, 1988, IIE T, V20
[4]  
LEE HL, 1985, IIE TRANS, V17, P284, DOI 10.1080/07408178508975304
[5]  
LINDSAY GF, 1969, MANAGE SCI, V10, P342
[6]   TAXONOMY OF ECONOMICALLY BASED QUALITY-CONTROL PROCEDURES [J].
MENIPAZ, E .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1978, 16 (02) :153-167
[7]  
PETERS MH, 1987, MAY TIMS ORSA M NEW
[9]  
Silver E. A., 1976, INFOR. Canadian Journal of Operational Research and Information Processing, V14, P32
[10]   MANUFACTURING CYCLE TIME DETERMINATION FOR A MULTISTAGE ECONOMIC PRODUCTION QUANTITY MODEL [J].
SZENDROVITS, AZ .
MANAGEMENT SCIENCE, 1975, 22 (03) :298-308