HYBRID EXPERT SYSTEM FOR CONSTRUCTION PLANNING AND SCHEDULING

被引:24
作者
MOSELHI, O
NICHOLAS, MJ
机构
[1] Ctr. for Building Studies, Concordia Univ., Montreal, QC, H3G 1M8
来源
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE | 1990年 / 116卷 / 02期
关键词
D O I
10.1061/(ASCE)0733-9364(1990)116:2(221)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper presents an integrated hybrid expert system for construction planning and scheduling. The system integrates through an expert system building tool (ESBT) a relational data base, knowledge base, and its control functions; a traditional network analysis software; and interfacing programs written in FORTRAN language. This prototype system, which uses a microcomputer-based hybrid artificial intelligence environment, has some interesting features. One of its modules determines the job logic among the activities entered through an end-user interface. Another module, consisting of a set of stand-alone nested expert system submodules, modifies the unimpacted duration of activities to a realistic duration. These submodules account for variations in productivity level resulting from overtime, site congestion, reassignment of labor, learning curve, and weather conditions. An example application is presented to illustrate the essential features of the system. The system could be applied successfully in other domains, including teaching and training in construction management, analysis and preparation of construction claims, and management of contract changes. © ASCE.
引用
收藏
页码:221 / 238
页数:18
相关论文
共 38 条
[1]  
Adrian J.J., Construction Productivity Improvement, (1987)
[2]  
Ahuja H.N., Nandakumar V., Simulation model to forecast project completion time, J. Constr. Engrg. and Mgmt, 111, 4, pp. 325-342, (1985)
[3]  
Ashley D.B., Levitt R.E., Expert systems in construction: Work in progress, J. Comp, in Civ. Engrg, 1, 4, pp. 303-311, (1987)
[4]  
Baldwin J.R., Mantres J.M., Causes of delay in the construction industry, J. Constr. Div, 97, 2, pp. 177-187, (1971)
[5]  
Barrie D.S., Paulson B.C., Professional Construction Management, (1984)
[6]  
Benjamin N., Greenwald T.W., Simulating effects of weather on construction, J. Constr. Div, 99, 1, pp. 175-190, (1973)
[7]  
Carr I.R., Simulation of construction project duration, J. Constr. Div, 105, 2, pp. 117-127, (1979)
[8]  
Factors affecting productivity, Management Methods, (1976)
[9]  
Fenves S.J., What is an expert system, Expert Systems in Civil Engineering, pp. 1-6, (1985)
[10]  
Fersko-Weiss H., Master plans: Project management software, PC Magazine, 6, 16, pp. 153-209, (1987)