STABLE, DISTRIBUTED, REAL-TIME SCHEDULING OF FLEXIBLE MANUFACTURING ASSEMBLY DISASSEMBLY SYSTEMS

被引:194
作者
PERKINS, JR [1 ]
KUMAR, PR [1 ]
机构
[1] UNIV ILLINOIS,COORDINATED SCI LAB,URBANA,IL 61801
关键词
D O I
10.1109/9.21085
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
引用
收藏
页码:139 / 148
页数:10
相关论文
共 21 条
[1]   OPTIMAL-CONTROL OF PRODUCTION-RATE IN A FAILURE PRONE MANUFACTURING SYSTEM [J].
AKELLA, R ;
KUMAR, PR .
IEEE TRANSACTIONS ON AUTOMATIC CONTROL, 1986, 31 (02) :116-126
[2]  
Baker K. R., 1974, INTRO SEQUENCING SCH
[3]  
Bertsekas D., 1987, DATA NETWORKS
[4]   OPTIMALITY OF ZERO-INVENTORY POLICIES FOR UNRELIABLE MANUFACTURING SYSTEMS [J].
BIELECKI, T ;
KUMAR, PR .
OPERATIONS RESEARCH, 1988, 36 (04) :532-541
[5]  
BLAZEWICZ J, 1986, ANN OPERAT RES, V7
[6]  
Coffman E.G., 1976, COMPUTER JOB SHOP SC
[7]  
Conway R, 1967, THEORY SCHEDULING
[8]   ECONOMIC LOT SCHEDULING PROBLEM (ELSP) - REVIEW AND EXTENSIONS [J].
ELMAGHRABY, SE .
MANAGEMENT SCIENCE, 1978, 24 (06) :587-598
[9]   AN OPTIMAL STOCHASTIC PRODUCTION PLANNING PROBLEM WITH RANDOMLY FLUCTUATING DEMAND [J].
FLEMING, WH ;
SETHI, SP ;
SONER, HM .
SIAM JOURNAL ON CONTROL AND OPTIMIZATION, 1987, 25 (06) :1494-1502
[10]  
French S., 1982, SEQUENCING SCHEDULIN