共 15 条
[1]
BENTON WC, 1983, 834 OH STAT U WORK P
[2]
Berry W. L., 1972, PRODUCTION INVENTORY, V13, P19
[3]
BERRY WL, 1973, 434 PURD U PAP
[4]
BIGGS JR, 1977, PRODUCTION INVENTORY, V18, P104
[5]
Blackburn JD., 1982, J OPER MANAG, V2, P125, DOI [10.1016/0272-6963(82)90028-6, DOI 10.1016/0272-6963(82)90028-6]
[7]
COLLIER DA, 1982, J OPERATIONS MANAGEM, V2, P113
[8]
ECONOMIC LOT SIZE DETERMINATION IN MULTI-STAGE ASSEMBLY SYSTEMS
[J].
MANAGEMENT SCIENCE SERIES A-THEORY,
1973, 19 (05)
:517-527
[9]
HEMPHILL AD, 1978, 96 IND U DISC PAP
[10]
MCLAREN BJ, 1976, THESIS PURDUE U