EXTENDED PERIOD SIMULATION OF WATER-SYSTEMS - DIRECT SOLUTION

被引:26
作者
BHAVE, PR
机构
来源
JOURNAL OF ENVIRONMENTAL ENGINEERING-ASCE | 1988年 / 114卷 / 05期
关键词
D O I
10.1061/(ASCE)0733-9372(1988)114:5(1146)
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
引用
收藏
页码:1146 / 1159
页数:14
相关论文
共 10 条
  • [1] Cornish R.J., 1939, J I CIV ENG, V13, P147, DOI [10.1680/ijoti.1939.14420, DOI 10.1680/IJOTI.1939.14420]
  • [2] CROSS H, 1936, B U ILLINOIS ENG EXP, V386
  • [3] Jeppson R.W., 1977, ANAL FLOW PIPE NETWO
  • [4] Martin D.W., 1963, J I WATER ENG, V17, P115
  • [5] EXPLICIT PIPE NETWORK CALIBRATION
    ORMSBEE, LE
    WOOD, DJ
    [J]. JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCE, 1986, 112 (02): : 166 - 182
  • [6] RAO HS, 1977, J HYDR ENG DIV-ASCE, V103, P281
  • [7] RAO HS, 1977, J HYDR ENG DIV-ASCE, V103, P97
  • [8] Shamir U.Y., 1968, J HYDRAUL DIV, V94, P219, DOI DOI 10.1061/JYCEAJ.0001747
  • [9] TART JS, 1973, J AM WATER WORKS ASS, V65, P123
  • [10] Wood D.J., 1972, J HYDRAULICS DIVISIO, V98, P1157, DOI 10.1061/JYCEAJ.0003348