APPLICATION OF LINEAR AND DYNAMIC-PROGRAMMING TO THE OPTIMIZATION OF THE PRODUCTION OF HYDROELECTRIC POWER

被引:7
作者
OLCER, S [1 ]
HARSA, C [1 ]
ROCH, A [1 ]
机构
[1] ECOLE POLYTECH FED LAUSANNE,INST AUTOMAT,CH-1015 LAUSANNE,SWITZERLAND
关键词
D O I
10.1002/oca.4660060105
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
引用
收藏
页码:43 / 56
页数:14
相关论文
共 21 条
[1]  
[Anonymous], 1983, LARGE SCALE SYSTEMS
[2]   A NEW TYPE OF APPROXIMATION LEADING TO REDUCTION OF DIMENSIONALITY IN CONTROL PROCESSES [J].
BELLMAN, R .
JOURNAL OF MATHEMATICAL ANALYSIS AND APPLICATIONS, 1969, 27 (02) :454-&
[3]  
BELLMAN R, 1965, APPLIED DYNAMIC PROG
[4]  
CHARNOUSKO FL, 1982, OPT CONTR APPL METH, V3, P101
[5]   COMPUTER TIME AND MEMORY REQUIREMENTS FOR DP AND DDDP IN WATER-RESOURCE SYSTEMS-ANALYSIS [J].
CHOW, VT ;
MAIDMENT, DR ;
TAUXE, GW .
WATER RESOURCES RESEARCH, 1975, 11 (05) :621-628
[6]  
Courant R, 1962, CALCULUS VARIATIONS
[7]  
Denn M.M., 1969, OPTIMIZATION VARIATI
[8]  
El-Hawary M.E., 1979, OPTIMAL EC OPERATION
[9]   AN IMPLEMENTATION OF ESTIMATION TECHNIQUES TO A HYDROLOGICAL MODEL FOR PREDICTION OF RUNOFF TO A HYDROELECTRIC POWER-STATION [J].
FJELD, M ;
AAM, S .
IEEE TRANSACTIONS ON AUTOMATIC CONTROL, 1980, 25 (02) :151-163
[10]  
FULTS DM, 1976, J WATER RES PLANNING, V4, P63