GREEDY RANDOMIZED ADAPTIVE SEARCH PROCEDURES

被引:1611
作者
FEO, TA
RESENDE, MGC
机构
[1] UNIV TEXAS, DEPT MECH ENGN, OPERAT RES GRP, AUSTIN, TX 78712 USA
[2] AT&T BELL LABS, MATH SCI RES CTR, MURRAY HILL, NJ 07974 USA
关键词
COMBINATORIAL OPTIMIZATION; SEARCH HEURISTIC; GRASP; COMPUTER IMPLEMENTATION;
D O I
10.1007/BF01096763
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Today, a variety of heuristic approaches are available to the operations research practitioner. One methodology that has a strong intuitive appeal, a prominent empirical track record, and is trivial to efficiently implement on parallel processors is GRASP (Greedy Randomized Adaptive Search Procedures). GRASP is an iterative randomized sampling technique in which each iteration provides a solution to the problem at hand. The incumbent solution over all GRASP iterations is kept as the final result. There are two phases within each GRASP iteration: the first intelligently constructs an initial solution via an adaptive randomized greedy function; the second applies a local search procedure to the constructed solution in hope of finding an improvement. In this paper, we define the various components comprising a GRASP and demonstrate, step by step, how to develop such heuristics for combinatorial optimization problems. Intuitive justifications for the observed empirical behavior of the methodology are discussed. The paper concludes with a brief literature review of GRASP implementations and mentions two industrial applications.
引用
收藏
页码:109 / 133
页数:25
相关论文
共 36 条
[1]   AN ALGORITHM FOR THE MANUFACTURING EQUIPMENT SELECTION PROBLEM [J].
BARD, JF ;
FEO, TA .
IIE TRANSACTIONS, 1991, 23 (01) :83-92
[2]   THE CUTTING PATH AND TOOL SELECTION PROBLEM IN COMPUTER-AIDED PROCESS PLANNING [J].
BARD, JF ;
FEO, TA .
JOURNAL OF MANUFACTURING SYSTEMS, 1989, 8 (01) :17-26
[3]   OPERATIONS SEQUENCING IN DISCRETE PARTS MANUFACTURING [J].
BARD, JF ;
FEO, TA .
MANAGEMENT SCIENCE, 1989, 35 (02) :249-255
[4]  
Bollobas B, 2001, RANDOM GRAPHS, V73
[5]  
BURKHARD R, 1991, EUROPEAN J OPERATION, V21
[6]  
CARRAGHAN R, 1990, OPERATIONS RES LETT, V9
[7]   SINGLE-MACHINE SCHEDULING TO MINIMIZE WEIGHTED EARLINESS SUBJECT TO NO TARDY JOBS [J].
CHAND, S ;
SCHNEEBERGER, H .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1988, 34 (02) :221-230
[8]   A GREEDY RANDOMIZED ADAPTIVE SEARCH PROCEDURE FOR MAXIMUM INDEPENDENT SET [J].
FEO, TA ;
RESENDE, MGC ;
SMITH, SH .
OPERATIONS RESEARCH, 1994, 42 (05) :860-878
[9]   FLIGHT SCHEDULING AND MAINTENANCE BASE PLANNING [J].
FEO, TA ;
BARD, JF .
MANAGEMENT SCIENCE, 1989, 35 (12) :1415-1432
[10]   A PROBABILISTIC HEURISTIC FOR A COMPUTATIONALLY DIFFICULT SET COVERING PROBLEM [J].
FEO, TA ;
RESENDE, MGC .
OPERATIONS RESEARCH LETTERS, 1989, 8 (02) :67-71