PERFORMANCE OF HIERARCHICAL PRODUCTION SCHEDULING POLICY

被引:31
作者
AKELLA, R
CHOONG, Y
GERSHWIN, SB
机构
[1] MIT, Lab for Information &, Decision Systems, Cambridge, MA, USA, MIT, Lab for Information & Decision Systems, Cambridge, MA, USA
来源
IEEE TRANSACTIONS ON COMPONENTS HYBRIDS AND MANUFACTURING TECHNOLOGY | 1984年 / 7卷 / 03期
关键词
FLEXIBLE MANUFACTURING SYSTEMS - HIERARCHICAL PRODUCTION SCHEDULING POLICY - IBM AUTOMATED CARD ASSEMBLY LINE;
D O I
10.1109/TCHMT.1984.1136360
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The performance of Kimemia and Gershwin's hierarchical scheduling scheme for flexible manufacturing systems, as enhanced by Gershwin, Akella, and Choong, is described. This method calculates times at which to dispatch parts into a system in a way that limits the disruptive effects of such disturbances as machine failures. Simulation results based on a detailed model of an IBM printed circuit card assembly facility are presented. Comparisons are made with other policies and the hierarchical policy is shown to be superior.
引用
收藏
页码:225 / 240
页数:16
相关论文
共 6 条
[1]  
AKELLA R, UNPUB SIMULATION FLE
[2]  
GERSHWIN SB, 1984, MIT LIDSFR1356 LAB I
[3]   AN ALGORITHM FOR THE COMPUTER CONTROL OF A FLEXIBLE MANUFACTURING SYSTEM [J].
KIMEMIA, J ;
GERSHWIN, SB .
IIE TRANSACTIONS, 1983, 15 (04) :353-362
[4]  
KIMEMIA JG, 1982, MIT LIDSTH1215 INF D
[5]   A PROOF FOR THE QUEUING FORMULA - L=LAMBDA-W [J].
LITTLE, JDC .
OPERATIONS RESEARCH, 1961, 9 (03) :383-387
[6]  
1983, IEEE SPECTRUM MAY