MULTIPROCESSOR SCHEDULING WITH INTERPROCESSOR COMMUNICATION DELAYS

被引:35
作者
LEE, CY
HWANG, JJ
CHOW, YC
ANGER, FD
机构
[1] NATL CHIAO TUNG UNIV,DEPT MANAGEMENT SCI,HSINCHU,TAIWAN
[2] UNIV FLORIDA,DEPT COMP & INFORMAT SCI,GAINESVILLE,FL 32611
[3] FLORIDA INST TECHNOL,DEPT MATH & COMP SCI,MELBOURNE,FL 32901
关键词
D O I
10.1016/0167-6377(88)90080-6
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:141 / 147
页数:7
相关论文
共 12 条
[1]  
BRUNO J, 1982, DETERMINISTIC STOCHA, P367
[2]  
CHEN NF, 1975, LECTURE NOTES COMPUT, P1
[3]  
Coffman E.G., 1976, COMPUTER JOB SHOP SC
[4]  
COFFMAN EG, 1972, ACTA INFORM, V1, P200, DOI DOI 10.1007/BF00288685
[5]  
Graham R. L., 1979, Discrete Optimisation, P287
[6]   BOUNDS ON MULTIPROCESSING TIMING ANOMALIES [J].
GRAHAM, RL .
SIAM JOURNAL ON APPLIED MATHEMATICS, 1969, 17 (02) :416-&
[7]  
HU YC, 1961, OPERATIONS RES, V9, P841
[8]  
HWANG JJ, 1987, THESIS U FLORIDA
[9]  
Lam S., 1977, SIAM Journal on Computing, V6, P518, DOI 10.1137/0206037
[10]  
LAWLER E, 1982, DETERMINISTIC STOCHA, P367