ENGINEERING CHANGE ADMINISTRATION - THE KEY ISSUES

被引:20
作者
BALCERAK, KJ [1 ]
DALE, BG [1 ]
机构
[1] UNIV MANCHESTER,INST SCI & TECHNOL,MANCHESTER SCH MANAGEMENT,MANCHESTER M60 1QD,LANCS,ENGLAND
来源
COMPUTER INTEGRATED MANUFACTURING SYSTEMS | 1992年 / 5卷 / 02期
关键词
ENGINEERING CHANGE; MANAGEMENT;
D O I
10.1016/0951-5240(92)90007-Y
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This case study was carried out at the European Trucks Transmission Division of Eaton Corporation, and provides some useful insights into the relatively unexplored issue of engineering change (EC). Poor EC control was identified as a major contributing factor to low bill of material accuracy, and this was the main reason for instigating research into development of the EC procedure. Among the main findings are: people often confuse the reason for an EC with its purpose; organizations faced with many problematic ECs should investigate the adequacy of their design abilities and procedures; the EC classification scheme should be by both type (impact of the change within the organization) and grade (urgency of the change); all but the simplest ECs require more than one determinant to be considered when deciding the effectivity date; and feedback is essential to the success of an EC procedure.
引用
收藏
页码:125 / 132
页数:8
相关论文
共 11 条
[1]  
BALCERAK KJ, 1991, INT J PROD RES
[2]  
BALCERAK KJ, 1987, ENG MANAGE INT, V4, P177
[3]  
COPPLE PJ, 1973, MRP ENG CHANGE HIGH, P1
[4]  
FRANK DN, 1980, 23RD P APICS C, P270
[5]  
GALATI UK, 1983, 23RD P APICS C, P279
[6]  
GARNETT N, 1984, FINANCIAL TIMES 0312, P12
[7]  
GARWOOD D, 1981, SUCCESSFULLY STRUCTU
[8]  
GARWOOD D, BILLS MATERIAL
[9]  
HUGE EC, 1977, 20TH P APICS C, P81
[10]  
KNOX CS, 1983, CAD CAM SYSTEMS PLAN