Analysing the novated design and construct contract from the client's, design team's and contractor's perspectives

被引:26
作者
Doloi, Hemanta [1 ]
机构
[1] Univ Melbourne, Fac Architecture, Bldg & Planning, Melbourne, Vic 3010, Australia
关键词
Design novation; procurement practice; factor analysis;
D O I
10.1080/01446190802512359
中图分类号
F [经济];
学科分类号
02 ;
摘要
The novated design and construct (ND&C) contract is one of the increasingly preferred options among developers of large commercial and residential projects across Australia. As a consequence of novation, the design team's obligation to the client gets transferred to the contractor who becomes responsible for carrying out the detailed design work at a later stage of project life cycle. Subsequently, there are some inherent factors that can depict the effectiveness of how all parties in the process interact leading to a successful delivery of project through ND&C contracts. A common set of 31 influencing attributes have been identified through a systematic research approach and their relative significance and impacts have been determined based on a structured questionnaire survey in selected construction projects. By performing the factor analysis, a total of eight factors significant to ND&C contracts were extracted, namely (1) impact of initial design; (2) client's involvements in post novation design; (3) selection of design team; (4) contractor's obligation; (5) morale in post novation; (6) experience of design team; (7) relationship between contractor and design team; and (8) expertise of DT in ND&C projects. With a clear understanding of the roles of clients, design team and the contractors, these findings could potentially contribute to develop a company's procedures or enhance existing knowledge in relation to the ND&C procurement approach.
引用
收藏
页码:1181 / 1196
页数:16
相关论文
共 28 条
[1]  
Abrahams K., 2003, P RICS FDN CONSTR BU, P24
[2]  
Akintoye A., 1994, J CONSTR MANAG EC, V12, P155
[3]  
Andrews S., 1999, ARCHITECTS J, V46
[4]  
Arnold S., 2005, THESIS
[5]  
Chan A.P.C., 1999, AUSTR I QUANTITY SUR, V3, P1
[6]  
Chan D. W. M., 1997, International Journal of Project Management, V15, P55, DOI 10.1016/S0263-7863(96)00039-7
[7]  
Chappell D., 1994, ARCHITECTS J, P43
[8]  
Field A., 2009, DISCOVERING STAT USI, V3rd ed.
[9]  
Griffith A., 2004, AUSTR J CONSTRUCTION, V3, P13
[10]  
Howden R., 1992, USE NOVATION CONTRAC