共 13 条
[1]
Bean J.C., Birge J.R., Mittenthal J., Noon C.E., Matchup scheduling with multiple resources, release dates and disruptions, Operations Research, 39, 3, pp. 470-483, (1991)
[2]
Bolat A., Yano C.A., Scheduling algorithms to minimize utility work at a single station on a paced assembly line, Production Planning and Control, 3, 4, pp. 393-405, (1988)
[3]
Bolat A., Yano C.A., A surrogate objective for utility work in paced assembly lines, Production Planning and Control, 3, 4, pp. 406-412, (1988)
[4]
Burns L.D., Daganzo C.F., Assembly line job sequencing principles, Research Publication GMR-5127, General Motors Research Laboratory, (1985)
[5]
Buzacott J.A., Abandoning the moving assembly line: Models of human operators and job sequencing, International Journal of Production Research, 28, 5, pp. 821-839, (1990)
[6]
Chakravarty A.K., Shtub A., A cost minimization procedure for mixed model production lines with normally distributed task times, European Journal of Operations Research, 23, pp. 25-36, (1986)
[7]
Coffman P.E., Hoffman S.E., Weiner S.A., An OR view of assembly plant modeling, Working Paper, Ford Motor Co, (1985)
[8]
Ghosh S., Gagnon R.J., A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems, International Journal of Production Research, 27, 4, pp. 637-670, (1989)
[9]
Miller F.W., Design for assembly: Ford’s better idea to improve products, Manufacturing Systems, pp. 22-24, (1988)
[10]
Parrello B., Kabat W.C., Wos L., Job-shop scheduling using automated reasoning: A case study of the car-sequencing problem, Journal of Automated Reasoning, 2, pp. 1-42, (1988)