共 16 条
[1]
Bertrand J.W.M., 1990, PRODUCTION CONTROL S
[2]
BOMBERGER E, 1966, MANAGE SCI, V12, P778
[3]
BOURLAND KE, 1994, 299 AMOS TUCK SCH BU
[4]
Brown RG, 1963, SMOOTHING FORECASTIN
[7]
ITERATIVE PROCEDURE FOR SINGLE-MACHINE MULTI-PRODUCT LOT SCHEDULING PROBLEM
[J].
MANAGEMENT SCIENCE SERIES A-THEORY,
1973, 20 (01)
:50-55
[9]
Fransoo J. C., 1992, International Journal of Operations & Production Management, V12, P187, DOI 10.1108/EUM0000000001311