A NOTE ON THE EQUIVALENCE OF THE WILKERSON-IRWIN AND MODIFIED DUE-DATE RULES FOR THE MEAN TARDINESS SEQUENCING PROBLEM

被引:6
作者
CHENG, TCE
机构
[1] Department of Actuarial and Management Sciences, University of Manitoba, Winnipeg
基金
加拿大自然科学与工程研究理事会;
关键词
D O I
10.1016/0360-8352(92)90033-G
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
We consider the problem of sequencing a set of simultaneously available jobs on a single-machine to minimize mean tardiness. Both the Wilkerson-Irwin (WI) and modified due-date (MDD) rules are effective heuristics for solving this problem. We show that the WI and MDD rules are in fact equivalent since both of them are based on the same local optimality condition for a pair of adjacent jobs. This provides some motivation to use the MDD and WI heuristics for the mean tardiness problem.
引用
收藏
页码:63 / 66
页数:4
相关论文
共 9 条
[1]   DYNAMIC-PROGRAMMING STATE-SPACE RELAXATION FOR SINGLE-MACHINE SCHEDULING [J].
ABDULRAZAQ, TS ;
POTTS, CN .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1988, 39 (02) :141-152
[2]  
Baker K., 1974, INTRO SEQUENCING SCH
[3]  
Baker K. R., 1983, J OPER MANAG, V4, P11, DOI [10.1016/0272-6963(83)90022-0, DOI 10.1016/0272-6963(83)90022-0]
[4]  
Baker K.R., 1982, J OPER MANAGE, V3, P37
[5]   MINIMIZING TOTAL TARDINESS ON ONE MACHINE IS NP-HARD [J].
DU, JZ ;
LEUNG, JYT .
MATHEMATICS OF OPERATIONS RESEARCH, 1990, 15 (03) :483-495
[6]   ONE-MACHINE SEQUENCING TO MINIMIZE CERTAIN FUNCTIONS OF JOB TARDINESS [J].
EMMONS, H .
OPERATIONS RESEARCH, 1969, 17 (04) :701-&
[7]   TIME-DEPENDENT TRAVELING SALESMAN PROBLEM AND ITS APPLICATION TO TARDINESS PROBLEM IN ONE-MACHINE SCHEDULING [J].
PICARD, JC ;
QUEYRANNE, M .
OPERATIONS RESEARCH, 1978, 26 (01) :86-110
[8]   A NOTE ON THE WEIGHTED TARDINESS PROBLEM [J].
RACHAMADUGU, RMV .
OPERATIONS RESEARCH, 1987, 35 (03) :450-452
[9]  
Wilkerson L.J., 1971, AIIE T, V3, P239, DOI DOI 10.1080/05695557108974812