A HEURISTIC RESCHEDULING ALGORITHM FOR COMPUTER-BASED PRODUCTION SCHEDULING SYSTEMS

被引:72
作者
LI, RK
SHYU, YT
ADIGA, S
机构
[1] Department of Industrial Engineering and Management, National Chiao Tung University, Hsinchu
[2] Department of Industrial Engineering and Operations Research, University of California at Berkeley, Berkeley, CA
关键词
D O I
10.1080/00207549308956824
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Generation of new production schedules in response to changes that take place on a factory shop-floor is a common requirement in today's complex and flexible manufacturing environment. The current approaches use either a regeneration rescheduling method, which results in unsatisfactory response times or methods that need too much manual intervention for identifying the operations to be changed. We propose a new rescheduling algorithm to address these problems. Our algorithm is based on the construction of a scheduling binary tree and a net change concept adopted from MRP system. It revises schedules by rescheduling only those operations that need to be revised. Our algorithm can be embedded in existing simulation-based scheduling systems or electronic Gantt chart approaches to improve their effectiveness.
引用
收藏
页码:1815 / 1826
页数:12
相关论文
共 6 条
  • [1] Output Analysis, (1990)
  • [2] Farhoodi F., A knowledge-based approach to dynamic job-shop scheduling, International Journal of Computer Integrated Manufacturing, 3, pp. 84-95, (1990)
  • [3] Grant H.F., Nof S.Y., Automatic adaptive scheduling of multiprocessor cells, Proceedings of the Xth International Conference on Production Research, pp. 174-175, (1989)
  • [4] Kanet J.J., Sridharan V., The electronic leistand: A new tool for shop scheduling, Manufacturing Review, 3, pp. 161-170, (1990)
  • [5] Salvendy G., Handbook of Industrial Engineering, 11, 6, (1982)
  • [6] Yamamoto M., Nof S.Y., Scheduling/rescheduling in the manufacturing operating system environment, International Journal of Production Research, 23, pp. 705-722, (1985)