PRODUCTION LINES WITH PHASE-TYPE OPERATION AND REPAIR TIMES AND FINITE BUFFERS

被引:17
作者
ALTIOK, T
机构
[1] Rutgers Univ, Dep of Industrial, Engineering, Piscataway, NJ, USA, Rutgers Univ, Dep of Industrial Engineering, Piscataway, NJ, USA
关键词
FINITE BUFFERS - PHASE-TYPE OPERATION - PRODUCTION LINES;
D O I
10.1080/00207548508904723
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
引用
收藏
页码:489 / 498
页数:10
相关论文
共 8 条
[1]  
ALTIOK T, 1982, OCT C DEC CONTR FLOR
[2]  
ALTIOK T, 1982, NCSU824 TECHN REP
[4]   MODELS OF AUTOMATIC TRANSFER LINES WITH INVENTORY BANKS - REVIEW AND COMPARISON [J].
BUZACOTT, JA ;
HANIFIN, LE .
AIIE TRANSACTIONS, 1978, 10 (02) :197-207
[5]  
GERSHWIN SB, 1982, AIIE T, V13, P2
[6]  
Okamura K., 1977, AIIE Transactions, V9, P127, DOI 10.1080/05695557708975134
[7]   COMPARISON OF NUMERICAL TECHNIQUES IN MARKOV MODELING [J].
STEWART, WJ .
COMMUNICATIONS OF THE ACM, 1978, 21 (02) :144-152
[8]   EFFECT OF INTERSTAGE BUFFER STORAGE ON THE OUTPUT OF 2 UNRELIABLE PRODUCTION UNITS IN SERIES, WITH DIFFERENT PRODUCTION-RATES [J].
WIJNGAARD, J .
AIIE TRANSACTIONS, 1979, 11 (01) :42-47