SELECTION OF ROADWAY GRADES THAT MINIMIZE EARTHWORK COST USING LINEAR-PROGRAMMING

被引:81
作者
EASA, SM
机构
关键词
D O I
10.1016/0191-2607(88)90024-6
中图分类号
F [经济];
学科分类号
02 ;
摘要
引用
收藏
页码:121 / 136
页数:16
相关论文
共 23 条
[1]  
*AM ASS STAT HIGHW, 1984, POL GEOM DES HIGHW S
[2]  
BAKER A, 1972, TRRL LR469 REP
[3]  
CHARD M, 1972, TRRL459 DEP ENV REP
[4]  
CLAFFEY P, 1971, 111 TRANSP RES BOARD
[5]  
DAVIES H, 1972, TRRL LR463 DEP ENV R
[6]   EARTHWORK ALLOCATIONS WITH NONCONSTANT UNIT COSTS [J].
EASA, SM .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1987, 113 (01) :34-50
[7]   OPTIMIZATION MODEL FOR AGGREGATE BLENDING [J].
EASA, SM ;
CAN, EK .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1985, 111 (03) :216-230
[8]   STOCHASTIC PRIORITY MODEL FOR AGGREGATE BLENDING [J].
EASA, SM ;
CAN, EK .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1985, 111 (04) :358-373
[9]  
GATES M, 1975, J CONSTRUCT DIV-ASCE, V101, P861
[10]  
GATES M, 1975, J CONSTRUCT DIV-ASCE, V101, P853