An improved artificial fish swarm algorithm for optimal operation of cascade reservoirs

被引:19
作者
Peng, Yong [1 ]
机构
[1] Dalian Univ Technol, Hydraul Engn Inst, Dalian, Peoples R China
关键词
Reservoir operation; Optimization; Hydroelectric power generation;
D O I
10.4304/jcp.6.4.740-746
中图分类号
TP39 [计算机的应用];
学科分类号
081203 [计算机应用技术]; 0835 [软件工程];
摘要
Based on traditional artificial fish swarm algorithm (AFSA), an improved artificial fish swarm algorithm (IAFSA) is proposed and used to solve the problem of optimal operation of cascade reservoirs. To improve the ability of searching the global and the local extremum, the vision and the step of artificial fish are adjusted dynamicly in IAFSA. Moreover, to increase the convergence speed, the threshold selection strategy is employed to decrease the individual large space gap between before and after update operation in the local update operation. The validity of IAFSA is proved by case study and the threshold parameters of IAFSA are rated.
引用
收藏
页码:740 / 746
页数:7
相关论文
共 12 条
[1]
Hydro-thermal scheduling by tabu search and decomposition method [J].
Bai, XM ;
Shahidehpour, SM .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1996, 11 (02) :968-974
[2]
A NETWORK FLOW MODEL FOR SHORT-TERM HYDRO-DOMINATED HYDROTHERMAL SCHEDULING PROBLEMS [J].
FRANCO, PEC ;
CARVALHO, MF ;
SOARES, S .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1994, 9 (02) :1016-1022
[3]
NONLINEAR APPROXIMATION METHOD IN LAGRANGIAN RELAXATION-BASED ALGORITHMS FOR HYDROTHERMAL SCHEDULING [J].
GUAN, XH ;
LUH, PB ;
ZHANG, L .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1995, 10 (02) :772-778
[4]
Multipurpose reservoir operation using particle swarm optimization [J].
Kumar, D. Nagesh ;
Reddy, M. Janga .
JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2007, 133 (03) :192-201
[5]
Ant Colony Optimization for multi-purpose reservoir operation [J].
Kumar, D. Nagesh ;
Reddy, M. Janga .
WATER RESOURCES MANAGEMENT, 2006, 20 (06) :879-898
[6]
Li LX, 2002, SYST ENG THEORY PRAC, V22, P32
[7]
[彭勇 PENG Yong], 2009, [水力发电学报, Journal of Hydroelectric Engineering], V28, P49
[8]
The BC Hydro Short Term hydro scheduling optimization model [J].
Shawwash, ZK ;
Siu, TK ;
Russell, SOD .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2000, 15 (03) :1125-1131
[9]
Optimal operation of reservoir systems using simulated annealing [J].
Teegavarapu, RSV ;
Simonovic, SP .
WATER RESOURCES MANAGEMENT, 2002, 16 (05) :401-428
[10]
Evaluation of genetic algorithms for optimal reservoir system operation [J].
Wardlaw, R ;
Sharif, M .
JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 1999, 125 (01) :25-33